Utility Connections

240 views
Skip to first unread message

Bryce Mautino

unread,
Sep 18, 2025, 9:09:35 AM9/18/25
to 2026 Production Home Building Competition
Could you clarify the expectations regarding utility connections for the site? Should teams assume access to standard municipal infrastructure, or will alternative solutions need to be considered?

keltingcs

unread,
Sep 30, 2025, 6:42:11 PM9/30/25
to 2026 Production Home Building Competition
The provided ALTA file(s) shows the existing water main location, teams can assume a water tie-in along that main. For the sewer tie-in, teams should assume a sewer tie-in at the 40’ sanitary sewer easement to the east of the site along the Yellow River.

Walker Noon

unread,
Oct 9, 2025, 4:49:54 PM10/9/25
to 2026 Production Home Building Competition
Is the sewer tie-in you mentioned located anywhere on the ALTA survey? If not, can we get any clarity on where that tie-in is located?

keltingcs

unread,
Oct 14, 2025, 6:44:18 PM10/14/25
to 2026 Production Home Building Competition
A 40’ sanitary sewer easement is located to the southeast of the site. You can assume a connection near that general area.

keltingcs

unread,
Oct 14, 2025, 7:13:06 PM10/14/25
to 2026 Production Home Building Competition
Please see attached image.

On Thursday, October 9, 2025 at 1:49:54 PM UTC-7 walker....@gmail.com wrote:
image001(4).png
Reply all
Reply to author
Forward
0 new messages