Dustin worked on the dump truck heater.
 
Richard picked up rest of rock for Hairpin bank and placed it on the bank at Hairpin, we are waiting on more rock at this point.  Then Richard winterized everything that he could without affecting the meet.  Then he worked on replacing steel rail on corner leaving K & W entering Train Mountain.

Raven cleaned as the Fall Colors Meet dragged in dirt.

John

JOIN TRAIN MOUNTAIN -- http://www.TMRR.org

Fire Danger = MODERATE  http://scofmp.org/kfifc/kfifc.shtml
Industrial Fire Protection Level = I --  Fire Precaution requirements in effect  http://scofmp.org/ifpl.html
Fire Watch = 2 hours
Fire Truck with Water at each operation area
Fire Tools & Fire Extinguishers in Trucks

Oregon Landowner Fire Liability - http://www.friendstm.org/LandownerFireLiability.pdf
Fire Watch & Fire Tool Requirements - http://friendstm.org/FireToolsNotice.pdf

The lawyers continue working to resolve the Timberlake gates issue. Please be patient.


Charles Meinershagen

unread,
Oct 10, 2014, 5:11:43 PM10/10/14
to tmrrm...@googlegroups.com
John,

   I was able to run over most the track with my track blower Thurs, just before the meet.  There were a few sections that I just didn't have time to clean, since I was at TM only one day.  Leaving my house at 5 am and trying to get back to Redding before dark, left me with only about 6 hours on the track, with the shortening days in Autumn.  I used my hand-held blower for many of the sidings and intersections. I couldn't believe how thick the pine needles can build up in only a few weeks. I wish I could get back up there again this fall before the snow starts falling, but I kind of doubt it.  There is going to be a lot of leaves on Aspen Grove loop.  You all have fun at the fall colors meet. 