Richard replaced more outside aluminum rails at K&W with steel rail
  
Dustin and Richard finished the grade across the N end of the drain field… to re-connect the long tunnel to Wedding Cake and Coulton. Now that grade will sit over the winter.  Then they cut up a tree that had fallen across the tracks at Aspen Grove.

Raven cleaned in Central Station, finisged painting the outside handrails, and worked with Dustin to finish the inventory of fire extinguishers that need to be re-filled.

John

JOIN TRAIN MOUNTAIN -- http://www.TMRR.org

Fire Danger = MODERATE  http://scofmp.org/kfifc/kfifc.shtml
Industrial Fire Protection Level = I --  Fire Precaution requirements in effect  http://scofmp.org/ifpl.html
Fire Watch = 2 hours
Fire Truck with Water at each operation area
Fire Tools & Fire Extinguishers in Trucks

Oregon Landowner Fire Liability - http://www.friendstm.org/LandownerFireLiability.pdf
Fire Watch & Fire Tool Requirements - http://friendstm.org/FireToolsNotice.pdf

The lawyers continue working to resolve the Timberlake gates issue. Please be patient.