Wednesday at TM

46 views
Skip to first unread message

John C Black

unread,
Sep 10, 2014, 10:24:30 PM9/10/14
to

Dustin and Richard moved more equipment that was used for summer dirt work back to the Motor Pool or Central Station. Then they located water pipes in South Meadow as part of planning for the Scouts Camporee in May.  They fixed a toilet in Central Station and did several other minor tasks.

The plan is to work on finishing the Sceptic System next.   

Raven cleaned in Central Station.

John

JOIN TRAIN MOUNTAIN -- http://www.TMRR.org

Fire Danger = EXTREME  http://scofmp.org/kfifc/kfifc.shtml
IFPL = Level III  http://scofmp.org/ifpl.html

Fire Watch = 3 hours
No Tracked Vehicle Operation after 1:00pm
Fire Tools & Fire Extinguishers in Trucks
Fire Truck with Water at each operation area
Oregon Landowner Fire Liability - http://www.friendstm.org/LandownerFireLiability.pdf
Fire Watch & Fire Tool Requirements - http://friendstm.org/FireToolsNotice.pdf

The lawyers continue working to resolve the Timberlake gates issue. Please be patient.

John C Black

unread,
Sep 17, 2014, 9:58:02 PM9/17/14
to

Dustin and Richard continued work on the Sceptic System and the RR grade across the N end of the drain field.  Dustin built a prototype of a rack that mounts on thr front of Gators and other places.  The rack holds an Indian Back Pack sprayer for fire protection.   He is mounting it on a Gator for testing.  Comments are appreciated.
Reply all
Reply to author
Forward
0 new messages