Looks like they're going to be doing some construction on the pedestrian bridge in SSF connecting the office park to hoteland: https://goo.gl/maps/rQg1PHercGD2 The sign indicated it'll close Wed 9/30 at 6:30am. It claimed it'll reopen on Thursday, but I should have double checked the date (could be more than a few days). Moreover, start dates are more trustworthy than end dates.Skyline and Colmaways will be safer bets for later in the week. If anyone has more information, I'd appreciate it. There's a sign at the bridge which might have more information, but I didn't stop fully this morning.
--
-- follow: http://twitter.com/sf2g | terms: http://sf2g.com/terms.html | bike prep: http://sf2g.com/bike-prep.html | unsub: http://groups.google.com/group/sf2g
---
You received this message because you are subscribed to the Google Groups "SF2G" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sf2g+uns...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Looks like they're going to be doing some construction on the pedestrian bridge in SSF connecting the office park to hoteland: https://goo.gl/maps/rQg1PHercGD2 The sign indicated it'll close Wed 9/30 at 6:30am. It claimed it'll reopen on Thursday, but I should have double checked the date (could be more than a few days). Moreover, start dates are more trustworthy than end dates.Skyline and Colmaways will be safer bets for later in the week. If anyone has more information, I'd appreciate it. There's a sign at the bridge which might have more information, but I didn't stop fully this morning.
--
The signs are still up as of Thursday @ 18:00.