Continuing the week of "not-quite-Skyline" Skylines, anyone interested in an East Bay Skyline on Friday? My plan would be to BART to Rockridge and follow the usual route (Tunnel->Skyline->Pinehurst->Redwood) as far as Castro Valley, then continue down Redwood Road through downtown Hayward and on to my office by the San Mateo bridge. For the rest of you continuing south you could do the classic Palomares route, or follow me and do the southern half of the east-bayway.
Nathan
--
-- follow: http://twitter.com/sf2g | terms: http://sf2g.com/terms.html | bike prep: http://sf2g.com/bike-prep.html | unsub: http://groups.google.com/group/sf2g
---
You received this message because you are subscribed to the Google Groups "SF2G" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sf2g+uns...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Continuing the week of "not-quite-Skyline" Skylines, anyone interested in an East Bay Skyline on Friday? My plan would be to BART to Rockridge and follow the usual route (Tunnel->Skyline->Pinehurst->Redwood) as far as Castro Valley, then continue down Redwood Road through downtown Hayward and on to my office by the San Mateo bridge. For the rest of you continuing south you could do the classic Palomares route, or follow me and do the southern half of the east-bayway.
Nathan
--
-- follow: http://twitter.com/sf2g | terms: http://sf2g.com/terms.html | bike prep: http://sf2g.com/bike-prep.html | unsub: http://groups.google.com/group/sf2g
---
You received this message because you are subscribed to the Google Groups "SF2G" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sf2g+uns...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Nathan,
Great call! You meant this Friday 5/20 right? 6 years in SF2G and not for once I have tried the East Bay Skyline nor I know the route :)
I will definitely join you for this ride this Friday if you call for a early rollout like 6:30 or an even earlier BART.
Ramesh.
Continuing the week of "not-quite-Skyline" Skylines, anyone interested in an East Bay Skyline on Friday? My plan would be to BART to Rockridge and follow the usual route (Tunnel->Skyline->Pinehurst->Redwood) as far as Castro Valley, then continue down Redwood Road through downtown Hayward and on to my office by the San Mateo bridge. For the rest of you continuing south you could do the classic Palomares route, or follow me and do the southern half of the east-bayway.
Nathan
--
I will definitely join you for this ride this Friday if you call for a early rollout like 6:30 or an even earlier BART.
Ugh! Sorry Nathan :(
I have just been scheduled to interview someone on Friday morning and I have no power to say no for this. I hope others can join but I would be down for Middle East Skyline for some other Friday though.
Ramesh
Assuming we leave Rockridge at 6:30, probably by 10:30, but I'm not really sure. I'd guess it's around 3:30 moving time from Rockridge, based on a ride from 2 years ago that had me at 2:35 from Rockridge to Union City BART. You can cut at least 30 minutes of that by doing the east-bayway instead of Palomares, although Palomares is a great road. Traditionally this route has included a stop at Bodi's Java House in Castro Valley which can add 30 minutes of social non-moving time.
Nathan
Although, I could be convinced on a later roll-out, with the ride ending at Castro Valley or Hayward BART, if that's of interest to Yvonne or anyone else.
Nathan
Nathan
re: time and effort, it's comparable to HMBW, though I end up feeling less tired after this one.
Only day that works for me next week is Thursday. Would that work for anyone else? The week after is more open, but of course that's no longer May.