1. The two files being compared lack a common anscestor file.
2. The compare utility requires a table name for the basis of comparison and
the two tables in each of the files are not identical.
--
If this post was helpful, please consider rating it.
Jim Aksel, MVP
Check out my blog for more information:
http://www.msprojectblog.com