can you check if the Cubes have been build. You can see this by looking into
the Analysis Server.
Thanks
--
Marc Soester [MVP]
National Manager: EPM
http://marcsoester.blogspot.com
Thanks.
it seems that you dont have an issue with the cube build itself, but with
settings on your local Web browser.
Please do the following to see if this resolves your issue:
within the internet browser go to Tools > Internet Options > Security >
Trusted Sites > and click on the "custom Level..." button.
Under Settings, fint the Mescellaneous section and ensure that your "Access
data source accross domains" is set to enable.
Click ok, close your browser, open PWA and check if you can access the cubes
via Data Analysis now.
Hope this helps
Thank for your help.
can you try to log on to a different computer and check if you can access
the cube from there. I believe something is not quite right with your current
computer and would like to check if you can use the cube on another computer
when you access the Data Analyser page, I assume that you dont see anything
about the data analyser or can you see at least the toolbar for data analyser?
this tells me that it has something to do with the connection between the
server and your desktop. You said that you have this problem on every desktop
you logon, this tells me that the office web components are not corrupt in
anyway. You also mentioned that the cube builds just fine and in the past you
had the abillity to use the OLAP cubes. Somehting must have changed regarding
connections. Is it possible that you do not have the backward compadebillity
components installed. can you please make sure to check that you guys have
the backward compadebillity components installed. Let me know if they have
been installed. We will get to the bottom of it eventually :) Sorry for these
many questions, but it is difficult to try to help without beeing there :)
I actually mean the backward compatebillity on your Desktop. If you guys run
Office 2003 you need to install the backward compatebillity components on
your desktop
Project Server web site should be added to Trusted Sites via group policy.
Any users that need to access Data Analysis views will need to have 'Access
Data Sources Across Domains' set to Enabled in the security options for
Trusted Sites, and also need the Microsoft SQL Server 2005 Analysis Services
9.0 OLE DB Provider component installed
I hope this helps
yes that could certainly be the reason. You may want to talk to your
infrastructure people and ask to do some test on your desktop regarding
firewall.
Thank you
Olga Maritza Romero
Colombia
MESSAGE -----------
03-junio-08 06:17:00
Hola Valeria,
De hecho, me refiero a la compatebillity atrás en el escritorio. Si ustedes correr
Office 2003 es necesario instalar los componentes compatebillity atrás en
tu escritorio
Project Server sitio web, debe añadirse a través de Sitios de confianza de grupo.
Cualquier usuarios que necesitan acceso de Análisis de Datos opiniones necesidad de disponer de "Acceso
Fuentes de datos en todos los dominios' ajustado a habilitado en las opciones de seguridad para
Sitios de confianza, y también la necesidad de Microsoft SQL Server 2005 Analysis Services
9.0 OLE DB Provider componente instalado
Espero que esta ayuda
--
Soester Marc [MVP]
Nacional Manager: EPM
http://marcsoester.blogspot.com
botón
Error con el cubo OLAP - ValeriaChiuk
01-Jul-08 07:56:01
IA € ™ ll tratar de reanudar mi situación:
Estoy utilizando Project Server 2007 con Office 2007, el cubo está generando
perfectamente, puedo acceder a él desde el servidor, pero no de los clientes. I
puede acceder también el cubo de Business Scorecard Manager. Tenemos el SQL
2005 compatibilidad hacia atrás instalado en el servidor.
El Project Server sitio web está configurado como un sitio de confianza y hemos de Acceso
Fuentes de datos en todos los dominios' ajustado a habilitado en las opciones de seguridad para
Sitios de confianza en el Explorer.
Estoy recibiendo el siguiente mensaje de error cuando intento ver el enlace Análisis de Datos
en la PWA. "Código de error = 0xC1010000, el código externo = 0x0000274C".
Solía ver el cubo. I dona € ™ t de saber lo que sucedió que de un día para
otro que couldnâ € ™ t ver nunca más.
Recientemente, nuestro pueblo de TI me dijo que había puesto un firewall entre el servidor
y los puestos de trabajo, esto puede tener efecto alguno sobre ella?
Cualquier ayuda?
botón
Error con el cubo OLAP - MarcSoesterMV
01-Jul-08 08:11:03
Hola Valeria,
Sí que puede ser la razón. Si lo desea, puede hablar con su
infraestructura de las personas y pedir a hacer algunos test en su escritorio en relación con
firewall.
--
Soester Marc [MVP]
Nacional Manager: EPM
http://marcsoester.blogspot.com