Wayne and I will be going up (Lahaina) to my container in the morning to pick up the bench tops and the leg sets. We will be able to off load them at the space but we may not be able to get them up the stairs I will need some volunteers to help with that on Thursday night. The boxes said use two people to move and they were not joking The stainless one will go in the conference room the wood top will go to the shop room. Today I finished the Server cabinet except for the pass through to the shop for wires and the vents in the doors. I did plane the door edges so they now fit in the openings. I moved the large tools from that room as now all of the major work with cutting is done. The Miter say is on the scaffold in the hall the table saw is in the shop room.
Easy tasks for Thursday evening Final polish of that room Sweep dust wash windows etc. Set up tables and chairs. Install projector mount in ceiling I built it today.
Maybe Mount bench legs ( someone needs to bring a Drill with a 1/2" chuck and if someone has a Brace ( Old fashion manual drill with a chuck that holds square bits) You will know what it is if you have one Mine are buried. I need it to set the threaded inserts in the bench tops. Last time someone used a power drill on my special bit he ruined it and I had to make a new one so that will not happen again on my watch.
For the benches we will need to decide if we want the lateral under bench support to be a shelf or a vertical member
Wayne has powered up the water heater so that water is now hot. Our panel is not live yet but the wires down to the box down stairs are pulled He will lead all electric work Ron was installing outlets last night maybe Wayne will let him do that again but not close them up.
Our sign designers need to get together and make some signs for the windows. The Regular Makers sign is hanging in the conference room window but it is opaque so even with the lights on nobody can read it .
Items we need for the space
Dust pan or grain scoop ( Large Aluminium shovel used to move Loose granular products)
Hand Soap
Dish detergent
DVD Player
Keyboards and Mice
Flat panel monitor with HDMI Input for Raspberry PI
Last night I instructed the crew to get rid of the large white 4 X 8 board in the hallway If some one could come with a circ saw and a guide we could use a piece of it for the pipe cover in back of the sink in the shop. Some one can take a shot at creating a cover that would be easy to remove to service the plumbing if needed. They could use the white board and the pine boards on the scaffold. The other part could be cut for bench stabilizers maybe.
We still need to have a bunch of file cabinets moved with the forklift down to the main floor.
We need the wire shelves and the big tool chest from the container brought to the space.
Someone mentioned about the big Air conditioner in the third room Based on its age it probably weighs in the neighborhood of 250 lbs We have not figured out where it is powered from That is a job for the building to do just after or while they are working on the sprinkler pipe. They need to get that fixed first then we can clean and paint that room. BTW there is no live electric power or lights in there so it is worthless until all of that is done
The switch by the main door lights up the yard lights so maybe the flood by the door is also live and burned out.
A Board member should take on this task with Vern and a punch list. For the inside hallway and stairs some rope lights plugged in while we are there would do the trick until The Building can fix the ones that are there .
We may be makers but we also are paying CAM and the building should be doing some of this with that money. . .