Additionally, we (Ross, Ian, and myself):
-got new belts for the Shopsmith Beltsander attachment, and got one installed
-got the blasting cabinet up to a more usable level (new gloves, safer abrasive, dust collection, lots of improved sealing)
-Started working on a dedicated bench for the blasting cabinet, though I didn’t get terribly far
—-all the pieces are cut, just need to screw it all together and sort out a top
—-using these plans:
http://www.hammerzone.com/archives/workshop/bench/below20xl.html, but smaller
-moved some things around to make room for the refrigerator in the “clean” half of the space
Sam
> <Seiko-Controller-Art-52.pdf>