All of the things we had shuffled into the computer room were slowing down the completion of the room. Something we probably should have done sooner and saved time. Apologies for the inconvenience.
Things should begin returning to a base functionality far sooner than the time things have been down. I hesitate to mention a specific time, considering the expectation of work progress and speed has been far higher than actual, and things have taken far longer than expected for many reasons. I will say, however, that build in should progress far faster, considering we have some work benches to "drop in" to the new computer room, and the remainder of things are waiting to set up.
Hope this helps.