Storage Request #656: Flat-pack metal table frame by Gregory Lees

73 views
Skip to first unread message

no-r...@london.hackspace.org.uk

unread,
Jan 9, 2017, 7:48:53 AM1/9/17
to london-h...@googlegroups.com
Flat-pack metal table frame
https://london.hackspace.org.uk/storage/656
by Gregory Lees
12th Jan 2017 - 12th May 2017
Request for 4 months in the basement (Middle storage area)

The final tabletop dimensions will be approx. 1.2m x 0.75m. Assembled, the table will be 0.6m high, but the design is that it should break down into legs, a top panel and side panels.

Initially there will be a selection of steel box-section tubes. I will be cutting them and sliver soldering them together to make a metal frame that will later have wooden inserts added, but I will do that as a separate project.

***If no one replies to this topic the request will be automatically approved within 2 days.***

no-r...@london.hackspace.org.uk

unread,
Jan 17, 2017, 12:23:56 PM1/17/17
to london-h...@googlegroups.com
Status changed to Approved with the reason 'No Onjections' by David Mansfield

no-r...@london.hackspace.org.uk

unread,
Jan 27, 2017, 1:34:23 AM1/27/17
to london-h...@googlegroups.com
Status changed to Passed Deadline with the reason 'Still there? Gone? Please update' by Philip ROY

Gregory Lees

unread,
Jan 27, 2017, 3:54:54 AM1/27/17
to London Hackspace
Um, my project deadline isn't until May. I've ordered parts and they will be arriving in the next few days. Can someone please reverse the "passed deadline" status.

no-r...@london.hackspace.org.uk

unread,
Jan 27, 2017, 4:51:10 AM1/27/17
to london-h...@googlegroups.com
Status changed to Pending Approval with the reason 'can't change from passed deadline directly to approved' by Mat Stace

no-r...@london.hackspace.org.uk

unread,
Jan 27, 2017, 4:51:50 AM1/27/17
to london-h...@googlegroups.com
Status changed to Approved with the reason 'Incorrectly changed to passed deadline' by Mat Stace

Gregory Lees

unread,
May 25, 2017, 5:09:51 PM5/25/17
to London Hackspace, no-r...@london.hackspace.org.uk
I'm still actively working on this project, but I'm not going to be finished by the current deadline (tomorrow).  It seems I underestimated how much work was involved.  I need to drill a few more holes, weld some plates onto the tabletop, weld the legs onto the plates, and then finally weld tabs onto the frame to hold the wooden panels. 

Is it possible to extend the project deadline by a month to 25 June?  I think this should be enough time to get it finished.

For info on the current state, I have uploaded a picture of the work in progress (legs are laid up and will be welded soon, but can be detached by unbolting to flat pack)
4e555547-e3d1-48c0-93ae-3cea4b2ee7b2.jpg

no-r...@london.hackspace.org.uk

unread,
Aug 14, 2017, 4:39:08 PM8/14/17
to london-h...@googlegroups.com
Status automatically changed to Passed Deadline

no-r...@london.hackspace.org.uk

unread,
Aug 29, 2017, 1:03:35 PM8/29/17
to london-h...@googlegroups.com
Status changed to Removed with the reason 'gone' by Paddy Duncan