Yesterday we had a CNC working group
One of the first things to do was to restore lighting to the basement which took up a significant amount of time, I would like to make a significant thank up to Steve who diverted from his project to help and Neil Munro who gave up a lot of his time, they both spent there day on it and made a real difference, there is still some work to be done in this domain.
Jasper also chipped in spending time look at parts and getting some tools for us and sorting out IT - many Thanks
Our regular soldiers were not shy either with Liam preparing some mounts on the Boxford and measuring up for other parts , Whilst Brett is looking at the CAD for the vacuum table
The CNC system admin team is doing well (you did not know you existed but you do) with Christian looking at the screen messages and Neil general system admin and Ansible
We will probably want another one or two days to get where we want too, however as all ways there will be a continuous flow of jobs CNC is not trivial and there is a constant flow of work to be done.
All in all a good day - Thanks Crew