End-of-Sale and End-of-Life Announcement for the Cisco Catalyst 6500 Series Supervisor Engine 720-3B/3BXL and Associated Memory Modules Only

137 views
Skip to first unread message

Minneapolis Cisco dealers

unread,
Jul 31, 2012, 10:50:15 AM7/31/12
to cisco-r...@googlegroups.com

Table 2. Product Part Numbers Affected by This Announcement

End-of-Sale Product
Part Number

Product Description

Replacement Product Part Number

Replacement Product Description

Additional Information

MEM-A-S720-SP-1GB

1GB Memory Option for WS-S720-3B

See the Product Migration Options section below for detailed information on replacing this product.

  

MEM-A-S720-SP-1GB=

1G Memory Upgrade Option spare

There is currently no replacement product available for this product.

  

MEM-MSFC3-1GB

1GB Mem for Sup720, Sup720-3B and MSFC2A

See the Product Migration Options section below for detailed information on replacing this product.

  

MEM-MSFC3-1GB=

1GB Mem for Sup720, Sup720-3B and MSFC2A

There is currently no replacement product available for this product.

  

MEM-S2-512MB

Catalyst 6500 512MB DRAM on the Supervisor (SUP2 or SUP720)

See the Product Migration Options section below for detailed information on replacing this product.

  

MEM-S2-512MB=

Catalyst 6500 512MB DRAM on the Supervisor (SUP2 or 720) Spare

There is currently no replacement product available for this product.

  

WS-SUP720-3B

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3B

VS-S2T-10G

Cat 6500 Sup 2T with 2 x 10GbE and 3 x 1GbE with MSFC5 PFC4

-

WS-SUP720-3B

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3B

VS-S720-10G-3C

Cat 6500 Supervisor 720 with 2 x 10GbE and 3x1GE MSFC3 PFC3C

-

WS-SUP720-3B=

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3B

VS-S2T-10G=

Cat 6500 Sup 2T with 2 x 10GbE and 3 x 1GbE with MSFC5 PFC4

-

WS-SUP720-3B=

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3B

VS-S720-10G-3C=

Cat 6500 Supervisor 720 with 2 x 10GbE and 3x1GE MSFC3 PFC3C

-

WS-SUP720-3BXL

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3BXL

VS-S2T-10G-XL

Cat 6500 Sup 2T with 2x10GbE and 3 x 1GbE with MSFC5 PFC4XL

-

WS-SUP720-3BXL

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3BXL

VS-S720-10G-3CXL

Cat 6500 Supervisor 720 with 2x10GbE and 3x1GE MSFC3 PFC3CXL

-

WS-SUP720-3BXL=

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3BXL

VS-S2T-10G-XL=

Cat 6500 Sup 2T with 2x10GbE and 3 x 1GbE with MSFC5 PFC4XL

-

WS-SUP720-3BXL=

Catalyst 6500/Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3BXL

VS-S720-10G-3CXL=

Cat 6500 Supervisor 720 with 2x10GbE and 3x1GE MSFC3 PFC3CXL

Table 1. End-of-Life Milestones and Dates for the Cisco Catalyst 6500 Series Supervisor Engine 720-3B/3BXL and Associated Memory Modules Only

Milestone

Definition

Date

End-of-Life Announcement Date

The date the document that announces the end of sale and end of life of a product is distributed to the general public.

January 31, 2012

End-of-Sale Date

The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.

January 30, 2013

Last Ship Date:
HW

The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.

April 30, 2013

End of SW Maintenance Releases Date:

HW 12.2(33)SXJ or 15.X SY: OS SW

The last date that Cisco Engineering may release any final software maintenance releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software. Support will be on Release 12.2(33)SXJ or follow on release in IOS 15.X train.

January 30, 2016

 

The last date that Cisco Engineering may release any final software maintenance releases or bug fixes on 12.2(33)SXJ . After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software. Support will be on a follow on release in IOS 15.X train.

December 1, 2013

Note: From the End of Software Maintenance Releases Date to the End of Software Maintenance Release through follow on release ("Extended Period of Support"), Cisco will provide only Critical Software Support defined as network services impacting bugs or security vulnerabilities that have been identified by the customer to Cisco TAC and subsequently qualified via Cisco's normal evaluation process. Critical Software Support will be provided according to the following terms and conditions:

• Cisco TAC will first use commercially reasonable efforts to work with the Customer to determine the locality of impact and to find a workaround for the problem.
• If an alternative workaround is not possible during the Extended Period of Support, then Cisco will make commercially reasonable efforts to provide a bug fix solution to remedy the problem.
• If despite commercially reasonable efforts Cisco is unable to provide a software based solution, it may be necessary for the Customer to remove or upgrade the impacted software based systems to correct the problem.
 

End of Routine Failure Analysis Date:
HW

The last-possible date a routine failure analysis may be performed to determine the cause of hardware product failure or defect.

January 30, 2014

End of New Service Attachment Date:
HW

For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.

January 30, 2014

End of Service Contract Renewal Date:
HW

The last date to extend or renew a service contract for the product.

April 30, 2017

Last Date of Support:
HW

The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.

January 31, 2018

Reply all
Reply to author
Forward
0 new messages