I _especially_ need help with moving items, and with painting.
SCHEDULE(-ish)JUN 2: 3pm-6pm : Packing and moving items out of the classroom
* Move two computers to the lounge so they can still be used for 3D/CAD
* Pack up the rest of the computers, and store in CoWorking until they find a permanent home in the Lounge, or elsewhere in the hackerspace
* Remove printers from the room to Lounge. Dell printer needs repair, will be moved to CoWorking until we can source a new transfer cartridge for it
* Take apart the desks along the back wall, stack the desk surfaces and store them for later use
* Move desks that are in the room to the lounge or elsewhere
BONUS : If I can get a volunteer or two -- pack the library up into boxes, and move out the shelving to the lounge
BONUS : If can get a volunteer or two -- pack the Robot Group cabinet up and move it to the dirty shop, next to the storage loft stairs.
JUN 3: ~1pm to ~4pm : More packing and/or starting the floor cleaning
* Move Library books & Robot group cabinet if not finished on the 2nd
* Pick up any debris in the room, throw it away
* Remove the whiteboard, put away temporarily after cleaning/scrubbing
* Give the carpet a good vacuuming
* Spot treat any stains on the industrial carpet.
* Bring my carpet cleaning machine, and give the carpet of the room a good industrial scrubbing.
* Wipe down the walls, patch and spackle any wall scrapes/holes
*
JUN 4: -- No work -- Carpet drying
* Manufacture one of the CNC tables, and check for fit and finish in the room with the chairs we already have.
* If the table fits well and works, manufacture the rest of them
JUN 5 & 6: 1pm-5pm : Painting / Cabinet / Furniture
* Remove switch trim plates, and attach plastic tarp to floor with masking tape.
* Trim three walls with gray paint, one wall with blue, then paint the walls.
* Install office supply cubby and cabinet door into the inset window area
JUN 7 : 9am -> Whenever
* Purchase two or three new 96" whiteboards, install on wall opposite doors
* Purchase two matching pull-down screens for projection, mount above the two whiteboards
* Install either the electric screen, or a pull down screen for the 1080p projector.
* Mount and install 1080p projector
* Install furniture.