Myles and I will be doing another build day this Saturday, from 10am to 4pm. There will be tasks for all skill levels and abilities. I'll order pizza for lunch if we have a good turnout, and people can stick around for board games afterwards! On the docket:--
Fix the Sliding Doors: We need to shim and shave the rail supports to level them out.
Insulate: The sliding door walls need to be lined with canvas and then insulated.
Particle Board: Finish covering the shop side of the walls with particle board.
Framing: Frame the opposite storage room wall
Sheetrock: We can put up some rough sheetrock on the inside of the storage room, and then we can actually use it to store stuff!
Electrical: There are 4 shop lights left to wire up, and we can also install more outlets and lights.
You received this message because you are subscribed to the Google Groups "Arch Reactor" group.
To unsubscribe from this group and stop receiving emails from it, send an email to arch-reactor+unsubscribe@googlegroups.com.
To post to this group, send email to arch-r...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/arch-reactor/74f3bc27-0a0b-4ba7-98a4-e7d78137f32b%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.