--
You received this message because you are subscribed to the Google Groups "TramsDownUnder" group.
To unsubscribe from this group and stop receiving emails from it, send an email to tramsdownunde...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/tramsdownunder/9d2541c5-d98e-43f0-9863-71e2c3e7f53cn%40googlegroups.com.
This will simply be a safety thing - at the southern end of Sydenham station the metro's track and overhead are 'air gaped' from the rest of the network. They will be bridging that gap and removing the connecting tracks between the Bankstown line and the rest of the network. That will require a possession of the Sydenham platform and will cut off access to the storage yard. They could probably run to Bangaroo and use the crossovers there, but that was probably deemed too confusing for users.
I assume there will be a shutdown on the Illawarra line at the
same time so the power can be isolated for the whole of Sydenham
Junction while they remove the connecting points and associated
infrastructure.
They are no where near systems integration and testing.
--
You received this message because you are subscribed to the Google Groups "TramsDownUnder" group.
To unsubscribe from this group and stop receiving emails from it, send an email to tramsdownunde...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/tramsdownunder/50c1ef4d-d6db-4a1e-a3ee-e93fa8709516n%40googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/tramsdownunder/c6fb33b7-589b-40d8-9dfe-c93e710b7f44n%40googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/tramsdownunder/367409a4-cf9a-4381-9512-366446dad9b8n%40googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/tramsdownunder/10fd91b4-0858-4bc3-a196-70422ba083d0n%40googlegroups.com.