FW: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719_Other - Task Acceptance

0 views
Skip to first unread message

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Jul 23, 2025, 4:40:08 AM7/23/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

202507019

Kanchadewa_SLN_ EBTS_JA9000-New Site Installation

AP_2025_1719

Manjula

Northern

JA9000

202507019-1

Kanchadewa_SLN_ EBTS_JA9000-New Site Installation-Material Supply

AP_2025_1719

Manjula

Northern

JA9000

 

 

 

 

 

Commissioning Data Details :

 

 

Detailed Project Scope(AP Upgrades) :

 

Sec 01

Please install the TA/3x65_WH Antenna @32m height and connect the RRU5909

Sec 02

Please install the TA/3x65_WH Antenna @32m height and connect the RRU5909

Sec 03

Please install the TA/3x65_WH Antenna @32m height and connect the RRU5909

 

Required Materials (AP Upgrades) :

 

RRU5909(2100) - 03

UBBPe4 - 01

UMPTe2 - 01

TA/3x65_WH  - 03

Jumper(RRU5909 to TA/3x65_WH Antenna) - 06

HUA_SFP+_1310_1.4KM_9.8G_LC_SM  - 06

Huawei BTS DBS 3900 RRU Fiber-SM 50m  - 3

RRU Power Cable - 55m - 3

Lamp pole BBU - BBU5900A(AC) – 01

 

 

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

 

 

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Tuesday, July 22, 2025 9:31 AM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719_Other - Task Acceptance

 

Input Task waiting for you

 

 

INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719_Other

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Kanchadewa_SLN_ EBTS-JA9000_New 4G_Addition_BTSinfoWO.xlsx
Re: Material Ready to Collect -Material Reservation/JA9000/AP_2025_1719/Janaka Priyanjana/2025-07-07 16:10:00/10778.eml
W No 86982.pdf
W No86983.pdf
GI4929087211.pdf
GI4929210402.pdf
AR10623289.pdf
AR10623288.pdf
RE: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719-Other.eml
AP Far End.csv
AP Near End.csv
TX Requirement.csv
BTS Information.csv
BBU Details.csv
Antenna Details - SAQ.csv
Material reservation Table - Initiation(ADV).csv
Reservation Number - Advantis.csv

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Aug 21, 2025, 3:18:15 AM8/21/25
to Janaka Priyanjana, Accenture Engineering, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Eranga Perera, gamage perera

Issued BBU & UMPT Card was faulty. pls arrange following item for the faulty replacement 

1000024439 HUA_BBU5900A_With_UEIU_(AC 220V/110V)
1000019508 HUA_UMPT board (UMPT-e2)


Best Regards,
Indika Kumara
Oxcenture Engineering 


--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/01fe01dbfbad%24537a9ca0%24fa6fd5e0%24%40gmail.com.

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Aug 21, 2025, 5:44:21 AM8/21/25
to Janaka Priyanjana, Accenture Engineering, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Eranga Perera, gamage perera

Pls ignore previous request. 

Best Regards,
Indika Kumara
Oxcenture Engineering 

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Aug 22, 2025, 4:17:07 AM8/22/25
to Dasun Madanayake, Sivarajah Thiyakarajah, Imesha Madushan, thushan.ramathas@dns.dialog.lk, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Namal Rathnayake

Dear All,

 

Please note that the JA9000_Kanchadewa_SLN_EBTS new site installation has been completed as per the WO. However, the following issues remain unresolved and require necessary arrangements from the respective parties:

 

  • EBTS setup installed without an outdoor cabinet.

 

  • AC to DC converter installed without backup batteries. In the event of a commercial power failure, the whole site goes down without external alarms. (Already informed)

 

  • External power alarm configuration and Neteco connection cannot be completed due to the absence of backup. (Already informed)

 

This is an escalation for your urgent attention. Kindly make the required arrangements to resolve these issues.

image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
RE: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719-Other.eml
WhatsApp Image 2025-08-22 at 08.23.14 (2).jpeg
WhatsApp Image 2025-08-22 at 08.23.14 (1).jpeg
WhatsApp Image 2025-08-22 at 08.23.14.jpeg
WhatsApp Image 2025-08-22 at 08.23.13.jpeg
WhatsApp Image 2025-08-22 at 08.24.01 (1).jpeg
WhatsApp Image 2025-08-22 at 08.24.01.jpeg
WhatsApp Image 2025-08-22 at 08.24.00.jpeg
WhatsApp Image 2025-08-22 at 08.23.59.jpeg
WhatsApp Image 2025-08-22 at 08.23.58.jpeg
WhatsApp Image 2025-08-22 at 08.23.15 (2).jpeg
WhatsApp Image 2025-08-22 at 08.23.15 (1).jpeg
WhatsApp Image 2025-08-22 at 08.23.15.jpeg

Dasun Madanayake

<Dasun.Madanayake@dns.dialog.lk>
unread,
Aug 22, 2025, 6:28:53 AM8/22/25
to Upul Dassanayake, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Namal Rathnayake, Ram Thushan, Imesha Madushan, Sivarajah Thiyakarajah, oxcenture.eranga@gmail.com, Ketheran Anantharaja

+ Dear Upul

 

Pls refer the site issue list identified at PAT.

 

  • Need to separate the Power cable and earth cables (casing not installed.
  • BBU box Lock broken
  • BBU Ext Alarm card not installed. Cannot configure Ext Alarms
  • No Battery Backup installed.

 

BR,

Dasun

 


Dialog - Internal

From: oxcentur...@gmail.com <oxcentur...@gmail.com>
Sent: Friday, August 22, 2025 1:47 PM
To: Dasun Madanayake <Dasun.Ma...@dns.dialog.lk>; Sivarajah Thiyakarajah <Sivarajah.T...@dialog.lk>; Imesha Madushan <imesha....@dns.dialog.lk>; Ram Thushan <thushan....@dns.dialog.lk>
Cc: teamox...@googlegroups.com; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Namal Rathnayake <Namal.Ra...@dns.dialog.lk>
Subject: FW: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719_Other - Task Acceptance

 

[EXTERNAL EMAIL] This email has been received from an external source – please review before actioning, clicking on links, or opening attachments.

Manjula Rathnayaka

<Manjula.Rathnayaka@dialog.lk>
unread,
Aug 22, 2025, 10:53:22 PM8/22/25
to Dasun Madanayake, Upul Dassanayake, Sivarajah Thiyakarajah, oxcenture.eranga@gmail.com, Tharanga Palliya Guruge, teamoxcenture@googlegroups.com, Namal Rathnayake, Ram Thushan, Imesha Madushan, Ketheran Anantharaja, Koshala Chandralal

Dear All,

Pls find Feedback.

 

 

Thanks/

 


Dialog - Internal

Upul Dassanayake

<Upul.Dassanayake@dialog.lk>
unread,
Aug 24, 2025, 1:09:33 AM8/24/25
to Dasun Madanayake, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Namal Rathnayake, Ram Thushan, Imesha Madushan, Sivarajah Thiyakarajah, oxcenture.eranga@gmail.com, Ketheran Anantharaja

+ Isuru

 

Thank you,

Upul.

 


Dialog - Internal

From: Dasun Madanayake <Dasun.Ma...@dns.dialog.lk>

Sent: Friday, August 22, 2025 3:59 PM
To: Upul Dassanayake <Upul.Das...@dialog.lk>
Cc: teamox...@googlegroups.com; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Namal Rathnayake <Namal.Ra...@dns.dialog.lk>; Ram Thushan <thushan....@dns.dialog.lk>; Imesha Madushan <imesha....@dns.dialog.lk>; Sivarajah Thiyakarajah <Sivarajah.T...@dialog.lk>; oxcentur...@gmail.com; Ketheran Anantharaja <Ketheran.A...@dns.dialog.lk>

Dasun Madanayake

<Dasun.Madanayake@dns.dialog.lk>
unread,
Aug 24, 2025, 10:53:09 PM8/24/25
to Upul Dassanayake, Manjula Rathnayaka, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Namal Rathnayake, Ram Thushan, Imesha Madushan, Sivarajah Thiyakarajah, oxcenture.eranga@gmail.com, Ketheran Anantharaja

Dear Manjula

 

An issue observed at AC DC convertors provided. Capacity is not enough to cater the RRU load. Cells getting up and down. Need urgent solution.

 

Need PSP direction.

 

BR,

Dasun

 


Dialog - Internal

WhatsApp Image 2025-08-24 at 20.47.19.jpeg
WhatsApp Image 2025-08-24 at 20.46.59.jpeg

Manjula Rathnayaka

<Manjula.Rathnayaka@dialog.lk>
unread,
Aug 25, 2025, 12:25:17 AM8/25/25
to Dasun Madanayake, Upul Dassanayake, Tharanga Palliya Guruge, teamoxcenture@googlegroups.com, Namal Rathnayake, Ram Thushan, Imesha Madushan, Sivarajah Thiyakarajah, oxcenture.eranga@gmail.com, Ketheran Anantharaja, Koshala Chandralal

@Tharanga Palliya Guruge pls kindly check & do needful.

 

@Dasun Madanayake pls kindly consider this as planning issue and need to fulfill  through upgrade path.  

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Aug 29, 2025, 2:34:00 AM8/29/25
to Dasun Madanayake, Isuru Sandaruwan, Upul Dassanayake, teamoxcenture@googlegroups.com, Manjula Rathnayaka, Namal Rathnayake, Ram Thushan, Imesha Madushan, Sivarajah Thiyakarajah, Ketheran Anantharaja

Dear All,

 

Pls note that the UAT rectification done.

 

•             Need to separate the Power cable and earth cables (casing not installed) - Done

•             BBU box Lock broken – Working now

•             BBU Ext Alarm card not installed. Cannot configure Ext Alarms – Card Installed

•             No Battery Backup installed : Pls get direction from the PSP team/ PM

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

 

 

 

From: Upul Dassanayake <Upul.Das...@dialog.lk>

Sent: Sunday, August 24, 2025 10:39 AM
To: Dasun Madanayake <Dasun.Ma...@dns.dialog.lk>

image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
WhatsApp Image 2025-08-23 at 11.48.12.jpeg
WhatsApp Image 2025-08-23 at 11.56.01.jpeg
WhatsApp Image 2025-08-23 at 11.47.56.jpeg
WhatsApp Image 2025-08-23 at 11.47.44.jpeg
WhatsApp Image 2025-08-23 at 11.37.35.jpeg
WhatsApp Image 2025-08-23 at 11.37.34.jpeg
WhatsApp Image 2025-08-23 at 11.34.22.jpeg
WhatsApp Image 2025-08-23 at 11.34.14.jpeg
WhatsApp Image 2025-08-23 at 11.11.56.jpeg
WhatsApp Image 2025-08-23 at 11.11.47.jpeg

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Sep 15, 2025, 6:51:30 AM9/15/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Dear team,

 

Please find the attached UAT

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

 


Sent: Wednesday, July 23, 2025 2:10 PM
To: teamox...@googlegroups.com
Cc: 'Accenture Engineering' <accenture....@gmail.com>

Image removed by sender.

~WRD0004.jpg
image017.png
image009.png
image010.png
image011.png
image012.png
image013.png
image014.png
image015.png
image016.png
JA9000-Kanchadewa_SLN_ EBTS_New Site Installation-AP_2025_1719_Verified UAT Document.xlsx
Material Table - Implementation - Kanchadewa_SLN_ EBTS_JA9000-New Site Installation-AP_2025_1719.xlsx

Eranga Perera

<oxcenture.eranga@gmail.com>
unread,
May 28, 2026, 6:42:42 AMMay 28
to oxcenture.indika@gmail.com, oxcenture.muditha@gmail.com, oxcenture.billing@gmail.com, teamoxcenture

Dear @oxcentur...@gmail.com / @'oxcentur...@gmail.com',

 

Document has been rejected requesting images. Please check and arrange the updated UAT submission with the required images attached.

 

Dear @oxcentur...@gmail.com,

 

This ticket was rejected at the initial payment stage due to the required images not being available. This will delay our payment process. Therefore, please follow up closely until this issue is cleared.

 

Going forward, similar rejections will also be directed to you for close follow-up until resolution.

 

Please follow the below process for handling these types of rejection rectifications:

 

  1. Central PM rejects the documentation stage due to missing images or rectification requirements.
  2. WH24 ticket is then moved to the “Document Verification Rejection” stage and assigned to us.
  3. I will escalate the matter via email, mentioning the required corrections.
  4. After that, you can start the weekly follow-up process.
  5. Indika should schedule the site visit within a few days.
  6. Required details should then be shared with Muditha for the revised documentation.
  7. Muditha should send the corrected document to me.

 

Please ensure that stages 5, 6, and 7 are followed up closely, as we have previously experienced delays in the resubmission process.

 

 

Thanks & Regards,

Eranga Perera

Project Manager

Oxcenture Eng. PVT LTD

Mobile : 0707334473

~WRD0004.jpg
image017.png
image001.jpg
image009.png
image010.png
image011.png
image012.png
image013.png
image014.png
image015.png
image016.png
JA9000-Kanchadewa_SLN_ EBTS_New Site Installation-AP_2025_1719_Verified UAT Document.xlsx
Material Table - Implementation - Kanchadewa_SLN_ EBTS_JA9000-New Site Installation-AP_2025_1719.xlsx

Billing oxcenture

<oxcenture.billing@gmail.com>
unread,
Jun 2, 2026, 1:17:23 AM (12 days ago) Jun 2
to Eranga Perera, oxcenture.indika@gmail.com, oxcenture.muditha@gmail.com, teamoxcenture
Dear Eranga, 
My part is duly noted. 

Best Regards,

Dushmanthi Perera 

Billing Coordinator

Mobile : (+94) 777334873

Email   :oxcentur...@gmail.com



Oxcenture Sathees

<oxcenture.sathees.wh@gmail.com>
unread,
Jun 11, 2026, 12:23:34 AM (3 days ago) Jun 11
to oxcenture.muditha@gmail.com, teamoxcenture

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Jun 13, 2026, 7:05:36 AM (24 hours ago) Jun 13
to Eranga Perera, Accenture Engineering, teamoxcenture@googlegroups.com, oxcenture indika

Dear Eranga,

Please find the amended UAT

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

---------- Forwarded message ---------
From: <oxcentur...@gmail.com>
Date: Wed, Jul 23, 2025 at 2:10PM
Subject: FW: INH_Northern_JA9000_Kanchadewa_SLN_ EBTS_AP Upgrades_New Site Installation_AP_2025_1719_Other - Task Acceptance
To: <teamox...@googlegroups.com>
Cc: Accenture Engineering <accenture....@gmail.com>

 

Ref,

Image removed by sender.

~WRD0419.jpg
image009.png
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Material Table - Implementation - Kanchadewa_SLN_ EBTS_JA9000-New Site Installation-AP_2025_1719.xlsx
JA9000-Kanchadewa_SLN_ EBTS_New Site Installation-AP_2025_1719_Verified UAT Document.xlsx
Reply all
Reply to author
Forward
0 new messages