FW: INH_Southern_MR0017_Devinuwara_AP Upgrades_Sector Upgrade_AP_2025_1933_Other - Task Acceptance

0 views
Skip to first unread message

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Oct 2, 2025, 1:21:29 AM10/2/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

202509015

Devinuwara_MR0017-Sector Upgrade

AP_2025_1933

Ranga

Southern

 

Pls note that this WO completed with Event upgrade activity (WO : AP_2025_1812)

 

 

 

 

Detailed Project Scope(AP Upgrades) :

 

Antenna Removal

                                                Remove all event-upgraded antennas except the 5NPX antenna.

Sector Configuration

                                                Configure Sec 2 L18 and L21 as 2T2R 4-split using the 5NPX antenna. (LB 4,5/M-0/E-6) Azimuth -220

                                                Configure sec 2 DCS on New 32B3 RRU , That RRU need to connect to existing 18 Port antenna.

BBU Usage

                                                Use the existing BB5216 for this upgrade.

Cell Management

                                                Continue using the previous cells for L2600.

The cells are already commissioned; however, the following cells need to be removed.

License is required for the following

 

 

Required Materials (AP Upgrades) :

 

5NPX Antenna - 01 Nos (01 Nos Need remove from Magalla-GA0041 site /3G Only)

R503 - 01 Nos

RRU32B3 - 01 Nos (Need to remove from MR0086 - Sec 04 /RU-16 BXP_5 RRUS32B3*     1  OFF  ON  OFF N/A KRC161413/1   R1D )

Splitters - 02 Nos

RRU4499 - 02 Nos (02 RRU's already available at site)

Jumper cable for 4499 to 5NPX antenna - 06 Nos

Jumper cable for 4499 to Splitter - 02 Nos

Jumper cable for Splitter to 5NPX antenna - 04 Nos

Jumper cable for 32B3 to RV4T4-65D-R6VB (18 Port) - 04 Nos

Fiber cable - 03 Nos (100m from each)

Power cable - 03 Nos (70m from each)

SFP

RRU Power connecters.

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

Mobile : 0707334473

 

 

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Monday, September 29, 2025 12:14 PM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Southern_MR0017_Devinuwara_AP Upgrades_Sector Upgrade_AP_2025_1933_Other - Task Acceptance

 

Input Task waiting for you

 

 

INH_Southern_MR0017_Devinuwara_AP Upgrades_Sector Upgrade_AP_2025_1933_Other

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
TX Requirement.csv
Material reservation Table - Initiation(ADV).csv
Material reservation Table - Material Reservation Request.csv
Reservation Number - Advantis.csv

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Apr 6, 2026, 6:04:30 AMApr 6
to muditha sarojani, Accenture Engineering, teamoxcenture, Eranga Perera

Pls arrange access permission for the following list. 

No Name ID Num P Num
1 K P S Madushanka 870321449V 772025952
2 L S J Kumara 882870464V 773605361
3 KMG Upashantha 200223101242 750362049
4 ARGTD  Nelumdeniya 200528000302 0769365122
Vehicle - PJ-0183

Best Regards,
Indika Kumara
Oxcenture Engineering 


--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/00a301dc335c%2465e0c770%2431a25650%24%40gmail.com.

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Jun 13, 2026, 10:01:08 PM (9 hours ago) Jun 13
to oxcenture.ranil@gmail.com, teamoxcenture@googlegroups.com, Eranga Perera, oxcenture indika

Dear Ranil,

 

As discussed with Indika, please share the live inventory to get the installed RRU details

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

 

From: Eranga Perera <oxcentur...@gmail.com>
Sent: Friday, April 3, 2026 4:11 PM
To: oxcentur...@gmail.com
Cc: oxcentur...@gmail.com; 'Accenture Engineering' <accenture....@gmail.com>; 'Oxcenture Sathees' <oxcenture....@gmail.com>
Subject: FW: INH_Southern_MR0017_Devinuwara_AP Upgrades_Sector Upgrade_AP_2025_1933_Other - Task Acceptance
Importance: High

 

Dear @oxcentur...@gmail.com,

 

Pls attend UAT document preparation.

 

Note that should included removal from the following sites

 

5NPX Antenna - 01 Nos (01 Nos Need remove from Magalla-GA0041 site /3G Only)

RRU32B3 - 01 Nos (Need to remove from MR0086 - Sec 04 /RU-16 BXP_5 RRUS32B3*     1  OFF  ON  OFF N/A KRC161413/1   R1D )

 

 

Thanks & Regards,

Eranga Perera

Project Manager

Oxcenture Eng. PVT LTD

Mobile : 0707334473

Image removed by sender.

~WRD3016.jpg
image017.png
image009.png
image010.png
image011.png
image012.png
image013.png
image014.png
image015.png
image016.png

oxcenture.ranil@gmail.com

<oxcenture.ranil@gmail.com>
unread,
12:18 AM (7 hours ago) 12:18 AM
to oxcenture.muditha@gmail.com, teamoxcenture@googlegroups.com, Eranga Perera, oxcenture indika

Hi,

 

Pls find the Ericsson last week live inventory

 

Tks

Ranil Sanjeewa

image001.png
image010.jpg
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
Manoj_08115_HARDWARE_1780899563101(Live Inventory_Eric).xlsx
Reply all
Reply to author
Forward
0 new messages