Dear All,
Please note that Bradby Sheild 2026 - Kandy Leg will be held on 25th July 2026
Setup will be same as last year with the addition of 5G sector
Event Date : 25th July 2026
Site On-Air Date : 24th July 2026 [46 Days More]
Location : Trinity College Rugby Stadium, Pallekalle
7.278332, 80.710197
https://maps.app.goo.gl/a8SAUKwN8NffkSRK6
Dear @Chaminda,
Need to get Trinity College permission to install tower, same setup as last year.
Dear @Manjula, Oxcenture Team,
Please provide material availability in event buffer to initiate WH WO
@Niroshan Wickramasinghe, please assist with 5G Items
|
Material List |
Qty |
Availability |
|
ANDREW 2x9 Beam Panel Antenna (2X9NPA2010F) |
1 |
|
|
COMM Antenna T490ARIV2 (2300–2690 MHz, 90° HPBW) |
1 |
|
|
ERIC Radio 4499 (44B144B3, 18K+21K MHz, 80W) |
4 |
|
|
ERIC Radio 8863 (B41, 2496–2690 MHz, 40W) |
1 |
|
|
ERIC Baseband 6630 (INF 903 6083/02) |
1 |
|
|
ERIC GPS Kit |
1 |
|
|
ERIC 1/4" Jumper Nex-10M to 4.3-10M, 10m length |
8 |
|
|
Ericsson RET Cable 10m |
1 |
|
|
20m Outdoor Fiber |
4 |
|
|
50m Outdoor Fiber |
2 |
|
|
Ericsson SFP – 10 Nos |
10 |
|
|
Ericsson DC Power Cables |
180m |
|
|
1/2" Coaxial flexible cable (10m × 14) |
140m |
|
|
1/2" Connectors for RRU4499 Side |
14 |
|
|
1/2" Connectors for 9-Beam Antenna Side |
14 |
|
|
AIR3219 (For 5G) |
1 |
|
|
ERIC Baseband 6655 (For 5G) |
1 |
|
|
Ericsson 10G SFP (For 5G) |
2 |
|

Praboda Ranasinghe
Regional Manager
Radio Network Planning - Regional Planning (Central)
Dialog Axiata PLC | 249C, Katugastota Road, Kandy
praboda.r...@dialog.lk | www.dialog.lk
![]()
Dialog - Internal
Dear @Praboda Ranasinghe ,
Please find attached the material availability details for your reference.
Dear @Ranil Sanjeewa ,
Kindly arrange to request the unavailable materials from the OXC event buffer stock.
| Mat Code | Material List | Qty | Availability |
| ANDREW 2x9 Beam Panel Antenna (2X9NPA2010F) | 1 |
| Material avl @ oxc wh |
| COMM Antenna T490ARIV2 (2300–2690 MHz, 90° HPBW) | 1 |
| Material avl @ oxc wh |
| ERIC Radio 4499 (44B144B3, 18K+21K MHz, 80W) | 4 |
| Material avl @ oxc wh |
| ERIC Radio 8863 (B41, 2496–2690 MHz, 40W) | 1 |
| Matirial avl @ oxc wh |
| ERIC Baseband 6630 (INF 903 6083/02) | 1 |
| Material avl @ oxc wh | |||
| ERIC GPS Kit | 1 | Material avl @ oxc wh | |
| ERIC 1/4" Jumper Nex-10M to 4.3-10M, 10m length | 8 |
| Material avl @ oxc wh |
| Ericsson RET Cable 10m | 1 |
| Not AVL | |||
| 1000021687 | 20m Outdoor Fiber | 4 | Not AVL |
| 50m Outdoor Fiber | 2 | Material avl @ oxc wh | |
| Ericsson SFP – 10 Nos | 10 |
| Material avl @ oxc wh |
| Ericsson DC Power Cables | 180m |
| Matirial avl @ oxc wh |
| 1/2" Coaxial flexible cable (10m × 14) | 140m |
| Material avl @ oxc wh |
| 1000024890 |
| 1/2" Connectors for RRU4499 Side | 14 |
| Not AVL (10 Nos AVL) |
| 1/2" Connectors for 9-Beam Antenna Side | 14 |
| Matirial avl @ oxc wh | |||
| AIR3219 (For 5G) | 1 | N/A | |
| ERIC Baseband 6655 (For 5G) | 1 |
| N/A |
| Ericsson 10G SFP (For 5G) | 2 |
| N/A |
Dear Praboda,
Pls provide correct material codes for below items
Mat Code | Material List | Qty | Availability |
| Ericsson RET Cable 10m | 1 | Not AVL |
| AIR3219 (For 5G) | 1 | N/A |
| ERIC Baseband 6655 (For 5G) | 1 | N/A |
| Ericsson 10G SFP (For 5G) | 2 | N/A |
Tks
Ranil Sanjeewa
Dear Praboda,
Pls provide the material codes for below
Tks
Ranil Sanjeewa
From: oxcentu...@gmail.com <oxcentu...@gmail.com>
Sent: Friday, June 12, 2026 10:24 AM
To: 'Praboda Ranasinghe' <Praboda.R...@dialog.lk>
Cc: 'Chaminda Bandara' <chaminda...@dns.dialog.lk>; 'Ishika Madushanka (Contractor -OS)' <Ishika.M...@ext.dialog.lk>; 'Asela C. Bamunuarachchi' <Asela.Bamu...@dialog.lk>; 'Indunil Manoj' <Manoj....@dialog.lk>; 'Bihara Kulasooriya' <bihara.ku...@dns.dialog.lk>; 'Madhura Wattegedara' <Madhura.W...@dialog.lk>; 'Charith Kaluarachchi' <Charith.Ka...@dialog.lk>; 'Danushka Meepegama' <Danushka....@dns.dialog.lk>; 'Ranpath Perera' <Ranpath...@dialog.lk>; 'oxcentur...@gmail.com' <oxcentur...@gmail.com>; 'teamox...@googlegroups.com' <teamox...@googlegroups.com>; 'Darshana Bandara' <Darshana...@dialog.lk>; 'Niroshan Wickramasinghe' <Niroshan.Wi...@dialog.lk>; 'Saumya Gunawardana' <Saumya.Gu...@dialog.lk>; 'Tharanga Palliya Guruge' <Tharanga.Pa...@dialog.lk>; 'Chandana Rathnayake' <Chandana....@dns.dialog.lk>; 'Nimesh Batapola' <Nimesh....@dialog.lk>; 'Koshala Chandralal' <koshala.c...@dialog.lk>; 'Vihanga Wickramaarachchilage' <vihanga.wickra...@dialog.lk>; 'Oshadi Kottahachchi' <Oshadi.Ko...@dialog.lk>; 'Accenture Engineering' <accenture....@gmail.com>; 'Manjula Rathnayaka' <Manjula.R...@dialog.lk>; 'oxcentur...@gmail.com' <oxcentur...@gmail.com>; 'teamoxcenture' <teamox...@googlegroups.com>
Subject: RE: Event Triggering - KA - Bradby Sheild 2026 - Kandy Leg
Dear Praboda,
Pls provide correct material codes for below items
Mat Code | Material List | Qty | Availability |
| Ericsson RET Cable 10m | 1 | Not AVL |
| AIR3219 (For 5G) | 1 | N/A |
| ERIC Baseband 6655 (For 5G) | 1 | N/A |
| Ericsson 10G SFP (For 5G) | 2 | N/A |
Sent: Wednesday, June 10, 2026 11:35 AM
To: Ranil Sanjeewa <oxcentu...@gmail.com>; Praboda Ranasinghe <Praboda.R...@dialog.lk>
Cc: Chaminda Bandara <chaminda...@dns.dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>; Bihara Kulasooriya <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; oxcentur...@gmail.com; teamox...@googlegroups.com; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>; Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>; Accenture Engineering <accenture....@gmail.com>; Manjula Rathnayaka <Manjula.R...@dialog.lk>
|
Mat Code |
Material List |
Qty |
Availability |
|
|
AIR3219 (For 5G) |
1 |
N/A |
|
|
ERIC Baseband 6655 (For 5G) |
1 |
N/A |
|
|
Ericsson 10G SFP (For 5G) |
2 |
N/A |
Thanks
Praboda
Dialog - Internal
From: oxcentu...@gmail.com <oxcentu...@gmail.com>
Sent: Monday, June 15, 2026 9:01 AM
To: Praboda Ranasinghe <Praboda.R...@dialog.lk>; oxcentur...@gmail.com
Cc: Chaminda Bandara <chaminda...@dns.dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>; 'Bihara Kulasooriya' <bihara.ku...@dns.dialog.lk>;
Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; oxcentur...@gmail.com; teamox...@googlegroups.com;
Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>; Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana Rathnayake <Chandana....@dns.dialog.lk>;
Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>; 'Accenture Engineering' <accenture....@gmail.com>;
Manjula Rathnayaka <Manjula.R...@dialog.lk>; oxcentur...@gmail.com; 'teamoxcenture' <teamox...@googlegroups.com>
Subject: RE: Event Triggering - KA - Bradby Sheild 2026 - Kandy Leg
|
|
[CAUTION: External Email] Do not click links or open attachments unless you recognize the sender and know the content is safe. |
Dear All,
Please note that Lanka Premier League 2026 – Pallekalle Leg will be held from 28th July to 2nd August 2026
Only need to reconnect removed RRUs and power up the system
Event Duration : 28th July to 2nd August 2026 (6 Days)
Site On-Air Date : 27th July 2026 [41 Days More]
Location : Pallekalle Stadium
Dear @Lakmal,
FYNA, and to arrange access permissions
No new units addition, just replacing existing RRUs
Dear @Manjula, Oxcenture Team,
Please provide material availability in event buffer to initiate WH WO
|
Material List |
Qty |
Availability |
|
ERIC Radio 4499 (44B144B3, 18K+21K MHz, 80W) |
4 |
|
|
ERIC Radio 8863 (B41, 2496–2690 MHz, 40W) |
1 |
|
|
Relevant Jumpers 8863 to ADU Antenna |
3x4 |
|
|
Relevant Jumpers 4499 to HBXX3817 Antenna |
3x4 |
|
Praboda Ranasinghe
Regional Manager
Radio Network Planning - Regional Planning (Central)
Dialog Axiata PLC | 249C, Katugastota Road, Kandy
praboda.r...@dialog.lk | www.dialog.lk
![]()
Dialog - Internal
Dear All,
Please note that Lanka Premier League 2026 – Pallekalle Leg will be held from 28th July to 2nd August 2026
Only need to reconnect removed RRUs and power up the system
Event Duration : 28th July to 2nd August 2026 (6 Days)
Site On-Air Date : 27th July 2026 [41 Days More]
Location : Pallekalle Stadium
Dear @Lakmal,
FYNA, and to arrange access permissions
No new units addition, just replacing existing RRUs
Dear @Manjula, Oxcenture Team,
Please provide material availability in event buffer to initiate WH WO
|
Material List |
Qty |
Availability |
|
ERIC Radio 4499 (44B144B3, 18K+21K MHz, 80W) |
|
3 |
|
|
ERIC Radio 8863 (B41, 2496–2690 MHz, 40W) |
|
3 |
|
|
Relevant Jumpers 8863 to ADU Antenna |
3x4 |
|
|
Relevant Jumpers 4499 to HBXX3817 Antenna |
3x4 |
|
Praboda Ranasinghe
Regional Manager
Radio Network Planning - Regional Planning (Central)
Dialog Axiata PLC | 249C, Katugastota Road, Kandy
praboda.r...@dialog.lk | www.dialog.lk
![]()
Dialog - Internal
Dear Prabodha,
As discussed, pls confirm the visiting date at least one week in advance to arrange permission.
BR
Lakmal
Sent: Tuesday, June 16, 2026 3:49 PM
To: Chaminda Bandara <chaminda...@dns.dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>;
'Bihara Kulasooriya' <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>;
Ranpath Perera <Ranpath...@dialog.lk>; oxcentur...@gmail.com; oxcentur...@gmail.com; 'teamox...@googlegroups.com' <teamox...@googlegroups.com>; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>;
Lakmal Madushanka <Lakmal.M...@dialog.lk>
Cc: Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>;
Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>
Dear Praboda,
Pls share the WH24 reference & Share the Temp Site ID
Tks
Ranil Sanjeewa
Dear All,
Please note that this is late event triggering as request came in late
Event Date : 24th & 25th June 2026
Site On-Air Date : 23rd June 2026 [5 Days More]
Location : Gymnasium, Peradeniya University
7.255807, 80.595117
https://maps.app.goo.gl/Aro5rVSZzRPN9SH17
Dear @Chaminda,
Please arrange University permissions
Please start civil work immediately
Dear @Ishika,
As discussed, backhaul will be taken from Hanthana-SLA-KA9000
There will be around 50m of IF cables from ODU to Equipment cabinet
Dear @Ranpath,
University agreed to provide 1ph 15A connection from nearby DB
May need to install a breaker and lay power path towards equipment cabinet distance around 30m-40m

Dear @Manjula, Oxcenture Team,
Please provide material availability in event buffer to initiate WH WO
|
Material List |
Qty |
|
4T4R 2 Split Antenna (e.g XXDWH) |
1 |
|
4 Port Dual Array Antenna |
1 |
|
RRU4499 or RRU4490 |
3 |
|
Ericsson Baseband |
1 |
|
ERIC GPS Kit (For 5G Anchoring) |
1 |
|
Ericsson RET 3m |
3 |
|
Ericsson SFP |
6 |
|
20m Outdoor Fiber |
1 |
|
50m Outdoor Fiber |
2 |
|
Ericsson DC Power Cables (7m + 35mx2) |
77m |
|
RRU to 2split Antenna 3m Jumper |
8 |
|
RRU to DA Antenna 3m Jumper |
4 |

Praboda Ranasinghe
Regional Manager
Radio Network Planning - Regional Planning (Central)
Dialog Axiata PLC | 249C, Katugastota Road, Kandy
praboda.r...@dialog.lk | www.dialog.lk
![]()
Dialog - Internal
| Material List | Qty | Remarks |
| 4T4R 2 Split Antenna (e.g XXDWH) | 1 |
| AVL @ oxc WH |
| 4 Port Dual Array Antenna | 1 |
| AVL @ oxc WH | ||
| RRU4499 or RRU4490 | 3 | AVL @ oxc WH @ already mapped to Bradby Temp |
| Ericsson Baseband | 1 | AVL @ oxc WH @ already mapped to Bradby Temp |
| ERIC GPS Kit (For 5G Anchoring) | 1 |
| AVL @ oxc WH @ already mapped to Bradby Temp | ||
| Ericsson RET 3m | 3 | AVL @ oxc WH @ already mapped to Bradby Temp & katharagama Temp |
| Ericsson SFP | 6 | AVL @ oxc WH |
| 20m Outdoor Fiber | 1 | Not avl |
| 50m Outdoor Fiber | 2 | AVL @ oxc WH |
| Ericsson DC Power Cables (7m + 35mx2) | 77m |
| AVL @ oxc WH @ already mapped to Bradby Temp & katharagama Temp |
| RRU to 2split Antenna 3m Jumper | 8 |
| AVL @ oxc WH @ already mapped to Bradby Temp & katharagama Temp |
| RRU to DA Antenna 3m Jumper | 4 |
| AVL @ oxc WH @ already mapped to Bradby Temp & katharagama Temp |
--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/KL1PR02MB70048C48F69352045F9EDEAF9CE32%40KL1PR02MB7004.apcprd02.prod.outlook.com.
Dear Indika,
We can remove these items from 26th June Onwards
Since we have time for Bradby and Katharagama events let’s use allocated items
Will use 50m fibers – 3 nos due to unavailability of 20m fibers.
Will raise Wo without materials based on below
Thanks
Praboda
Dialog - Internal
From: oxcenture indika <oxcentur...@gmail.com>
Sent: Thursday, June 18, 2026 1:24 PM
To: teamox...@googlegroups.com; Praboda Ranasinghe <Praboda.R...@dialog.lk>
Cc: Chaminda Bandara <chaminda...@dns.dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>;
Bihara Kulasooriya <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>;
oxcentur...@gmail.com; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>; Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana
Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>
Subject: Re: Event Triggering - KA - Peradeniya Uni Convocation 2026
|
|
[CAUTION: External Email] Do not click links or open attachments unless you recognize the sender and know the content is safe. |
Dear @Praboda Ranasinghe ,
Dear All,
Please find WH WO
INH_Central_TM0115_Peradeniya_Uni_Temp_AP Upgrades_New Site Installation_AP_2026_2739-Event - New Site
Thanks
Praboda
Dialog - Internal
From: Praboda Ranasinghe
Sent: Thursday, June 18, 2026 3:20 PM
To: oxcenture indika <oxcentur...@gmail.com>; teamox...@googlegroups.com
Cc: Chaminda Bandara <chaminda...@dns.dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>;
Bihara Kulasooriya <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>;
oxcentur...@gmail.com; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>; Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana
Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>
Subject: RE: Event Triggering - KA - Peradeniya Uni Convocation 2026
Dear Indika,
We can remove these items from 26th June Onwards
Since we have time for Bradby and Katharagama events let’s use allocated items
Will use 50m fibers – 3 nos due to unavailability of 20m fibers.
Will raise Wo without materials based on below
Thanks
Praboda
From: oxcenture indika <oxcentur...@gmail.com>
@Imesha Sooriyabandara @Madhura Wattegedara @Charith Kaluarachchi pls pass this event Wos without any delay within today .
Dialog - Internal
Target MW removal - 26th June
From: oxcenture indika <oxcentur...@gmail.com>
Sent: Thursday, June 18, 2026 1:24 PM
To: teamox...@googlegroups.com; Praboda Ranasinghe <Praboda.R...@dialog.lk>
Cc: Chaminda Bandara <chaminda...@dns.dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>;
Bihara Kulasooriya <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>;
oxcentur...@gmail.com; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>; Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana
Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>
Subject: Re: Event Triggering - KA - Peradeniya Uni Convocation 2026
|
|
[CAUTION: External Email] Do not click links or open attachments unless you recognize the sender and know the content is safe. |
Dear @Praboda Ranasinghe ,
Dear Prabodha,
Pls share ticket numbers
Thanks,
Darshana.
Dialog - Internal
Hi Team
WO Initiated
Best Regards
Ravindra
Dialog - Internal
WO initiated without materials
INH_Central_TM0115_Peradeniya_Uni_Temp_AP Upgrades_New Site Installation_AP_2026_2739-Event - New Site
Thanks
Praboda
Sent: Friday, June 19, 2026 10:06 AM
To: Praboda Ranasinghe <Praboda.R...@dialog.lk>; oxcentur...@gmail.com
| No | Name | ID Num | P Num |
| 1 | W.B.S. Nuwan Kumara | 873252340 V/198732502340 | 774594189 |
| 2 | R. Sathis Kumar | 962023428 V | 772757427 |
| 3 | P.D.Terance | 773463565V | 779320248 |
| 4 | J D U Weerasinghe | 880363638V | 779808591 |
| 5 | K.A Saman Kumara | 830871594v | 762527661 |
| Vehicle - 58-1098 (Crew cab) | |||
Dear team,
Permission has been requested

Thanking you.
Best regards,
| Muditha Sarojani Oxcenture (Pvt) Ltd Mobile: (+94) 773330970 Email: oxcentur...@gmail.com |
Dear All,
WO released in WH,
Target Timeline =
Civil and E&E ready = 22nd July
Site On-Air = 24th July
Event Day = 25th July
INH_Central_TM0004_Bradby_Temp_2_AP Upgrades_New Site Installation_AP_2026_2767-Event - New Site
Dear @Chaminda,
Please arrange Trinity College permissions need to start work at least by 20th July
Dear @Niroshan,
As discussed need to finalize method to deliver 5G equipment to the site
Dear All,
Please find LPL WO
Only RRU connecting to existing antennas
Proposed to proceed early as possible since no power/Tx or civil dependency
Please inform @Lakmal to arrange access permissions at least 5 days before visiting
Target On Air Date = 26th July
INH_Central_KA0239_Pallekele_Stad_Out3_AP Upgrades_RRU Rearrangement_AP_2026_2768-Event - Upgrade
Thanks
Praboda
Dialog - Internal
Thanks
Tharanga
Evant Material_list Issued_Peradeniya_University_(22/06/2026).
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/002e01dd022f%249a9fdf30%24cfdf9d90%24%40gmail.com.
Dear All,
Please note that Dalada Perahera 2026 will be held from 18th August to 28th August
This time 8 sites needs to be upgraded based on current traffic and last year event loading stats
Event Duration : 18th August to 28th August [10 Days]
Site On-Air Date : 17th August (40 Days More)
Location : Kandy Town
Dear @Lakmal,
FYNA, to arrange KCC approval
Dear @Manjula, Oxcenture Team,
Please provide material availability in event buffer to initiate WH WO
You can utilize Katharagama, Bradby used materials here as well
5G equipment and 4T4R- 3 Split will provide from WH stock
Please feedback so detailed WOs can be released by Monday 13th
|
Site |
Total |
Kandy_BOC-KA0010 |
KCC_Temp-KA0029 |
Senanayake_Veediya_Reloc-KA0656 |
Kandy_Market-KA0042 |
Kandy_Town-KA0011 |
Kandy_North-KA0043 |
Kande_Veediya-KA0187 |
Kotugodella_St-KA0072 |
|
Pentabeam |
1 |
|
|
|
|
|
|
|
1 |
|
4T4R- 2 Split |
6 |
1 |
2 |
1 |
|
1 |
|
1 |
|
|
4T4R- 3 Split ** |
3 |
2 |
|
|
|
|
|
|
1 |
|
10p Antenna |
2 |
|
|
|
|
|
|
2 |
|
|
18p Antenna |
5 |
|
|
1 |
|
2 |
|
|
2 |
|
Dual Array Antenna |
2 |
1 |
1 |
|
|
|
|
|
|
|
T4 Antenna |
2 |
|
1 |
|
|
1 |
|
|
|
|
RRU4499/RRU4490 |
18 |
6 |
3 |
1 |
1 |
1 |
1 |
2 |
3 |
|
RRU8863 |
4 |
1 |
|
|
|
1 |
|
1 |
1 |
|
RRUS12B3/11B3 for DCS |
5 |
3 |
1 |
1 |
|
|
|
|
|
|
AIR3219 5G ** |
2 |
1 |
1 |
|
|
|
|
|
|
|
BB6630 |
2 |
1 |
|
1 |
|
|
|
|
|
|
GPS |
3 |
1 |
|
1 |
|
|
|
|
1 |
|
9p Cluster Cable MQ4+MQ5 |
7 |
|
|
1 |
2 |
2 |
|
|
2 |
Praboda Ranasinghe
Regional Manager
Radio Network Planning - Regional Planning (Central)
Dialog Axiata PLC | 249C, Katugastota Road, Kandy
praboda.r...@dialog.lk | www.dialog.lk
![]()
Dialog - Internal
@Praboda Ranasinghe pls check material requirement and provide details to request unavailable items in Event buffer to request from WH. material sourcing responsibility with UD.
Sent: Tuesday, July 7, 2026 9:28 PM
To: Chaminda Bandara <chaminda...@dns.dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ishika Madushanka (Contractor -OS) <Ishika.M...@ext.dialog.lk>; Asela C. Bamunuarachchi <Asela.Bamu...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>;
'Bihara Kulasooriya' <bihara.ku...@dns.dialog.lk>; Madhura Wattegedara <Madhura.W...@dialog.lk>; Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Indunil Manoj <Manoj....@dialog.lk>; Danushka Meepegama <Danushka....@dns.dialog.lk>;
Ranpath Perera <Ranpath...@dialog.lk>; oxcentur...@gmail.com; oxcentur...@gmail.com; 'teamox...@googlegroups.com' <teamox...@googlegroups.com>; Darshana Bandara <Darshana...@dialog.lk>; Niroshan Wickramasinghe <Niroshan.Wi...@dialog.lk>;
Lakmal Madushanka <Lakmal.M...@dialog.lk>
Cc: Saumya Gunawardana <Saumya.Gu...@dialog.lk>; Tharanga Palliya Guruge <Tharanga.Pa...@dialog.lk>; Chandana Rathnayake <Chandana....@dns.dialog.lk>; Nimesh Batapola <Nimesh....@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>;
Charith Kaluarachchi <Charith.Ka...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Oshadi Kottahachchi <Oshadi.Ko...@dialog.lk>