Joydip:
I apologize, for some reason your email just came through to me this morning that you sent on the 11th. If this is still an issue, you would need to edit the table in your master database named ‘ciorng’ (see snap below). Change the year value from 2200 to 3000, save the file/close; reopen your project and the year should be extended.
Nancy

From: swat...@googlegroups.com <swat...@googlegroups.com>
On Behalf Of Joydip Ghosh
Sent: Sunday, January 11, 2026 1:36 AM
To: SWAT-user <swat...@googlegroups.com>
Subject: [SWAT-user:13360] conversion from string "12/31/3000"to type 'date' is not valid
|
You don't often get email from joydipg...@gmail.com. Learn why this is important |
hello user
can you tell the error solution for
conversion from string "12/31/3000"to type 'date' is not valid
--
You received this message because you are subscribed to the Google Groups "SWAT-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
swatuser+u...@googlegroups.com.
To view this discussion visit
https://groups.google.com/d/msgid/swatuser/85fe2fe5-2276-4db8-8c49-59e5bf0fc1d1n%40googlegroups.com.
The year 2024 is not outside the range (2200) and should not be a problem.
From: Joydip Ghosh <joydipg...@gmail.com>
Sent: Tuesday, January 13, 2026 8:48 AM
To: Nancy B. Sammons <nancy....@brc.tamus.edu>
Cc: SWAT-user <swat...@googlegroups.com>
Subject: Re: [SWAT-user:13360] conversion from string "12/31/3000"to type 'date' is not valid
|
You don't often get email from joydipg...@gmail.com. Learn why this is important |
I want to show soil erosion for a river in the year 2024. What dates should I enter for these fields?