Dear Oscar,
Thank you.
I understand that v (uniform) and r (less uinform through the model).
1..May I use r for most sensitive paraments?
2..I understand which parameters are more responsible for which function like; for runoff, recharge, but when i am working continously i am getting stuck with time and whole operation.
Thanks
-Riad-
--
You received this message because you are subscribed to the Google Groups "SWAT-CUP" group.
To unsubscribe from this group and stop receiving emails from it, send an email to swat-cup+u...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/swat-cup/ac2886fd-59ae-4cdb-afd2-af3b90a7dac5n%40googlegroups.com.
Dear Oscar,
Thank you for your information,
I took 40 parameters and found the peak and baseflow deviation.
Then i increased and decreased the relevent parameters those i mentioned in the previous mail in image format.
The range i changed was lowest range to more lower value that i used previous time in this way i processed.
When i will change the range for reach peak and bases flow adjusted, is there any guide?
For my last 40 parameter selection, I get the r and v from the ArcSwat file after visualizing the change or constant values. My last NS value was -0.47
Regards
-Riad-
To view this discussion visit https://groups.google.com/d/msgid/swat-cup/d0bea14b-6787-4f84-97a8-47c283942533n%40googlegroups.com.