Joined:
Adrien, Andy, Charlie, Erik D, Felix, Henrik, Igor, Josh C, Joshua P, Kylo, Peter
Items in strikethrough are closed so can come off the review list next week.
Puppet:
Held over 3x:
2137: Merged but reverted due to issues exposed by test failures. New pull request needed.
2200: It would cause a regression. Contributor pinged. Need some guidance on how to proceed. Peter and Kylo to work on this.
2212: Moses working on this with contributor.
Held over 2x:
stdlib:
198: Andy merged today.
204: This was closed two weeks ago. Real issue should be addressed in core. Kylo pinged Nan to create that issue so we can discuss there.
213: Merged
Held over 1x:
Puppet:
2288: Folded into Ashley’s pull and this one was closed.
2086: Ashley and Adrien will work out the details. Looks good. Want to change the provider name from ruby to ini file. WIP
2287: Merged
2286: Merged
2284: Merged
2282: Ashley to follow up with the contributor
2281: Merged
2277: Henrik will add a test and merge it in.
2276: Looks ok, but we need a little bit of backstory to justify that we can actually do this and needs a ticket. Adrien to look into
2269: Some packaging changes. Andy pinging Haus. WIP
2268: Closed. Ashley will fold it into the grand yumrepo fix up.
2243/2238/2237: One closed, Josh to follow-up on the other two, checking in with Adrien.
2236: Closed with comment.
2227/2226/2225/2130: Closed. See puppet-dev thread on tiering of providers, etc.
New:
2024 - Charlie to review, pull into next sprint
2060 - pull into sprint after this, pup-728
2247 - looks good but substantial, at next triage let's review whether we have bandwidth to tackle this
2301 - Peter to review, pulling into next sprint