Jira (PDB-5272) Reconcile git commits, JIRA tickets, and versions (PuppetDB 6.19.0)

8 views
Skip to first unread message

Isaac Hammes (Jira)

unread,
Sep 16, 2021, 5:39:02 PM9/16/21
to puppe...@googlegroups.com
Isaac Hammes updated an issue
 
PuppetDB / Task PDB-5272
Reconcile git commits, JIRA tickets, and versions (PuppetDB 6.19.0)
Change By: Isaac Hammes
Epic Link: PUP-11253
Add Comment Add Comment
 
This message was sent by Atlassian Jira (v8.13.2#813002-sha1:c495a97)
Atlassian logo

Isaac Hammes (Jira)

unread,
Sep 16, 2021, 5:39:03 PM9/16/21
to puppe...@googlegroups.com
Isaac Hammes created an issue
Issue Type: Task Task
Assignee: Austin Blatt
Created: 2021/09/16 2:38 PM
Due Date: 2021/09/29
Priority: Normal Normal
Reporter: Isaac Hammes

(Initial planned release date: 2021-10-12)

Ensure all tickets referenced in the commit log have the release's fixVersion,
and ensure all tickets targeted at the release have a corresponding commit.
You can do this manually by checking out the branches you will be releasing, ensuring they
are in sync with the upstream puppetlabs repo and running the rake task

bundle install; bundle exec rake release:reconcile[NEXT_VER,LAST_VER]

This assumes you have the puppetdb repo as the cwd and the pe repo at ../pe-puppetdb-extensions.
These can be overridden by the PDB_PATH and PDB_PE_PATH environment variables.

The rake task will explain any mismatches that exist between Jira and the repos and ask you to investigate
any tickets that do not start with a PDB ticket, (maint), (docs), or (i18n)

Bogdan Irimie (Jira)

unread,
Oct 5, 2021, 9:03:03 AM10/5/21
to puppe...@googlegroups.com

Bogdan Irimie (Jira)

unread,
Oct 6, 2021, 3:18:02 AM10/6/21
to puppe...@googlegroups.com
Bogdan Irimie updated an issue
Change By: Bogdan Irimie
Sprint: ghost-20.10.2022
Story Points: 1
Reply all
Reply to author
Forward
0 new messages