Jira (PDB-5072) Reconcile git commits, JIRA tickets, and versions (PuppetDB 7.3.0)

7 views
Skip to first unread message

Morgan Rhodes (Jira)

unread,
Mar 25, 2021, 2:40:03 PM3/25/21
to puppe...@googlegroups.com
Morgan Rhodes created an issue
 
PuppetDB / Task PDB-5072
Reconcile git commits, JIRA tickets, and versions (PuppetDB 7.3.0)
Issue Type: Task Task
Assignee: Austin Blatt
Created: 2021/03/25 11:39 AM
Due Date: 2021/04/13
Priority: Normal Normal
Reporter: Morgan Rhodes

(Initial planned release date: 2021-04-20)

Ensure all tickets referenced in the commit log have a the release's fixVersion,
and ensure all tickets targeted at the release have a corresponding commit.
You can do this manually by checking out the branches you will be releasing, ensuring they
are in sync with the upstream puppetlabs repo and running the rake task

bundle install; bundle exec rake release:reconcile[NEXT_VER,LAST_VER]

This assumes you have the puppetdb repo as the cwd and the pe repo at ../pe-puppetdb-extensions.
These can be overridden by the PDB_PATH and PDB_PE_PATH environment variables.

The rake task will explain any mismatches that exist between Jira and the repos and ask you to investigate
any tickets that do not start with a PDB ticket, (maint), (docs), or (i18n)

Add Comment Add Comment
 
This message was sent by Atlassian Jira (v8.5.2#805002-sha1:a66f935)
Atlassian logo

Morgan Rhodes (Jira)

unread,
Mar 25, 2021, 2:40:03 PM3/25/21
to puppe...@googlegroups.com

Zachary Kent (Jira)

unread,
Apr 14, 2021, 5:30:04 PM4/14/21
to puppe...@googlegroups.com
Zachary Kent assigned an issue to Zachary Kent
Change By: Zachary Kent
Assignee: Austin Blatt Zachary Kent
This message was sent by Atlassian Jira (v8.13.2#813002-sha1:c495a97)
Atlassian logo
Reply all
Reply to author
Forward
0 new messages