Jira (PDB-4869) Check builds, promote to PE (PuppetDB 5.2.19)

3 views
Skip to first unread message

Austin Blatt (Jira)

unread,
Aug 24, 2020, 10:27:05 AM8/24/20
to puppe...@googlegroups.com
Austin Blatt updated an issue
 
PuppetDB / Task PDB-4869
Check builds, promote to PE (PuppetDB 5.2.19)
Change By: Austin Blatt
Epic Link: PDB-4864
Add Comment Add Comment
 
This message was sent by Atlassian Jira (v8.5.2#805002-sha1:a66f935)
Atlassian logo

Austin Blatt (Jira)

unread,
Aug 24, 2020, 10:27:05 AM8/24/20
to puppe...@googlegroups.com
Austin Blatt created an issue
Issue Type: Task Task
Assignee: Austin Blatt
Created: 2020/08/24 7:26 AM
Due Date: 2020/08/21
Priority: Normal Normal
Reporter: Austin Blatt

(Initial planned release date: 2020-08-25)

  • Check that all the builds are green.
  • If a release branch has already been cut Rebuild the pacakge promotion job with the release branch set instead of master or 2018.1.x.
  • Once it's promoted to the release branch checkout the release branch of enterprise-dist locally and verify that all platforms have the same tagged version of pe-puppetdb

bundle exec rake report:packages

  • If there were any important dependency bumps, such as to fix a bug or CVE, verify that they were updated by navigating to the release and then to the pe-puppetdb package on [pebuildinfo|pebuildinfo.slice.puppetlabs.net/].
  • Once builds are promoted push SNAPSHOT versions to both pdb and pdbext github repos targeting the next release.
  • Remember to revert pe-puppetdb-extensions to reading the version from the file
Reply all
Reply to author
Forward
0 new messages