Dear colleagues. I would like to inform you that the Ontology working group will organize two events in the IW 2018
1- The standard meeting of the Ontology Working group, next Monday, 22 Jan: 13:00-14:00, Grand Ballroom 8
2- A session titled Knowledge Management Case Study at P&G. (Monday, 22 Jan 15:30 -17:00)
I consider this session as REALLY attractive, and the content is superior as a practical application of Knowledge Management towards MBSE.
I enclose you the Information about the session and I hope we meet you in the room.
Working Group: Ontology Working Group
Session: Knowledge Management Case Study at P&G
Mon, 22 Jan: 15:30-17:00
Room: Main Street 1 (4144)
Abstract:
System Engineering for the Masses via Canonical Systems Model
Increasing product, supply chain and manufacturing complexity have driven industry to begin pursuing “Model Based System Engineering” (MBSE) tools and processes to optimize new product development. To this end, the past decade of development in systems engineering (SE) methods, standards and tools has resulted in many new foundational MBSE capabilities (e.g. ISO15288, SysML, FMI, OSLC, and countless other invaluable standards).
However, these capabilities have typically been applied in a bottom-up fashion to deliver benefits within the classic software and engineering disciplines. As a result, systems models often leave out many disciplines and fall short of the degree of abstraction required to support cross-discipline collaboration on the requirements of systems and the resulting models are often too solution-oriented to enable broad-scale re-use of the fundamental underlying technical knowledge in future, up-stream innovation work. Further, systems modeling tools generally lack the simple, but powerful user interface to provide basic answers to basic change impact and requirements trade-space questions posed by “the masses” (non-MBSE experts). Last, but not least, the complexity of the meta-models and user interfaces in use by today’s systems engineering tools require an “adoption activation energy” not available in today’s quarterly-profit-chasing mindset.
To
tackle the above challenges, P&G partnered with leading-edge systems
engineering method suppliers (ICTT and Big Lever), leading-edge tool suppliers
(e.g. IBM, TomSawyer, The ReUse Company, Modelon, and Big Lever) and systems
modeling tool configuration expertise (321gang). After two years of
development and multiple pilots, we have taken a big step forward in providing
the canonical systems modeling and analysis capabilities to deliver systems
engineering capabilities to “the masses”. The resulting method and tools
are usable by personnel at all levels of the enterprise, in all disciplines,
throughout all phases of an initiative’s lifecycle. This presentation
will review the key strategies and decisions behind the break-through new capability
and some aspects of the solution will be demonstrated.
Hugs,
Juan
Dear colleagues,
Thank you for the post!
The second session would have interest me indeed, if I had come. If any material is available and can be shared I would like to look at it.
Best
Anne
De : ont...@googlegroups.com [mailto:ont...@googlegroups.com]
De la part de Anabel Fraga
Envoyé : mercredi 17 janvier 2018 22:57
À : ont...@googlegroups.com
Objet : [onto4se] OWG IW2018 (Juan Llorens notification)
--
You can see our wiki site for the Ontology WG at:
https://sites.google.com/site/onto4syseng/
---
You received this message because you are subscribed to the Google Groups "Onto4SE" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
onto4se+u...@googlegroups.com.
To post to this group, send email to ont...@googlegroups.com.
Visit this group at https://groups.google.com/group/onto4se.
To view this discussion on the web visit
https://groups.google.com/d/msgid/onto4se/CAMZ7TtvNM2Ooh9Vfv5N7N4BaConcyejjw7m7KdTtuyr3WjbHjQ%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
The information in this e-mail is confidential. The contents may not be disclosed or used by anyone other than the addressee. Access to this e-mail by anyone else is unauthorised. If you are not the intended recipient, please notify Airbus immediately and delete this e-mail. Airbus cannot accept any responsibility for the accuracy or completeness of this e-mail as it has been sent over public networks. If you have any concerns over the content of this message or its Accuracy or Integrity, please contact Airbus immediately. All outgoing e-mails from Airbus are checked using regularly updated virus scanning software but you should take whatever measures you deem to be appropriate to ensure that this message and any attachments are virus free.
Hi.
Is there a webex session planned for subject#2 ?
Regards,
|
Etablissement de Villaroche Rond point René Ravaud BP 42 F-77551 MOISSY CRAMAYEL CEDEX |
|
Safran Aircraft Engines |
De : ont...@googlegroups.com [mailto:ont...@googlegroups.com]
De la part de MONCEAUX, Anne
Envoyé : jeudi 18 janvier 2018 10:09
À : ont...@googlegroups.com
Objet : RE: [onto4se] OWG IW2018 (Juan Llorens notification)
To view this discussion on the web visit https://groups.google.com/d/msgid/onto4se/16511_1516266549_5A606435_16511_6465_1_2a19dd9fa5d14aec9b68095c3badf02b%40DE0-03DAG05-P04.central.mail.corp.
For more options, visit https://groups.google.com/d/optout.
Hi all:
I will check if we have webex resource. I will be back before the beginning of the session
Hugs
To view this discussion on the web visit https://groups.google.com/d/msgid/onto4se/37d961714c2e432d9ed4e040159c6342%40Y003OLE.rd1.rf1.