Can you set up a new tab with a completely different set of tasks
43 views
Skip to first unread message
Andrea Orcutt
unread,
Mar 27, 2015, 4:47:15 AM3/27/15
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to mylifeo...@googlegroups.com
Can you set up a new tab with a completely different set of tasks when I open a new workspace it has the same lists that the original outline view does. I want two separate lists.
robisme (Olivier R)
unread,
Mar 27, 2015, 7:08:57 AM3/27/15
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to mylifeo...@googlegroups.com
You have to set a different view, play with filters, zoom in a folder, etc.
Stéph
unread,
Mar 27, 2015, 5:09:21 PM3/27/15
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to mylifeo...@googlegroups.com
All the tabs are views into the same MLO file - it won't work with multiple files at once. So, as Olivier says, you'll need to have your two views zoomed into different branches of your MLO file.