Groups
Groups
Sign in
Groups
Groups
Materials & Welding
Conversations
Labels
About
Send feedback
Help
External Piping loose items (ASME CERTIFICATION) welding at site
20 views
Skip to first unread message
Abraham Abi
unread,
Jul 30, 2019, 3:52:08 AM
7/30/19
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to material...@googlegroups.com
Dear experts ,
Utility Boiler stamped at SHOP having some external piping loose items which comes under certification will be welded at site .
Is it required AI involvement .
Thanks and Regards
Abraham A P
Bien_ND / weldinginspections.net
unread,
Aug 11, 2019, 3:19:18 AM
8/11/19
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to Materials & Welding
If you vessel designed under ASME Section VIII Div. 1.
Please see U-1 (e) will clear your questions.
Reply all
Reply to author
Forward
0 new messages