Dear members, I woluld like to ask a favor from you about the inspection requiremnts for spherical tank iam new for this job i dont have an idea what is the requiremnts Prior to accept the fit up ang after welding. Regards Vin |
since you are new you have to start studding the applicable construction Code or standard.
If you have any questions on the Code or standard, then you may address the forum.
The forum can not replace Codes and Standards
best regards
Dr. Georgios Dilintas
Authorized Nuclear Inspector
Authorized Inspector Supervisor
I&F REGIONAL TECHNICAL MANAGER
BUREAU VERITAS PIRAEUS - GREECE
Tel: +30 210 40 63 113 /4 /5
Fax: +30 210 40 63 118
Cell: +30 69 44 64 62 04
This message contains confidential information.
To know more, please click on the following link: http://disclaimer.bureauveritas.com
At first, You must identify the construction code of the equipment and then review it.
There you´ll have all inspection, examination and testing requirements for the tank
regards
Miroslav Tadic
Integrity Enginner
CEE
Gerencia de Producción - Mantenimiento
YPFB Chaco S.A.
--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
materials-weld...@googlegroups.com.
To post to this group, send email to
material...@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit
https://groups.google.com/d/msgid/materials-welding/1434997585.79550.YahooMailAndroidMobile%40web181503.mail.ne1.yahoo.com.
For more options, visit https://groups.google.com/d/optout.
--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To post to this group, send email to material...@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/OFAA65F9A4.082BC4A4-ONC2257E6D.0033C304-C2257E6D.0033EBE6%40LocalDomain.
Hi .
If is atmosféric tank is api 650 or 620 for fabrication for inspection is api 653 if is pressure tank is asme section 8 división 1 inspection is NB 23 or api 510 .
Best regars
Agustín Jimenez
Dear members, I woluld like to ask a favor from you about the inspection requiremnts for spherical tank iam new for this job i dont have an idea what is the requiremnts Prior to accept the fit up ang after welding.RegardsVin
--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To post to this group, send email to material...@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/1434997585.79550.YahooMailAndroidMobile%40web181503.mail.ne1.yahoo.com.