Good morning sir,
Now i working with duplex and super duplex , RO plant.
How to do the repairs in this material, for example we found two segment in 10 mm in 14 inch pipe.
Can we do partial repair, or fully cutout and reweld. Any code reference advice to do full cutout, or partial.
Second case this plant was handed over to the Clint, during commissioning we found leakage, not only the butt joint, even in the branch connection,
Aramco advise to do 100 %rt butt joint and branch.
Branch we can't do RT, placing a film is deficult. What to do in this.
Please advise me your experience and international, Aramco code reference.
Thank you