Hello Everyone,

As per Sec 8 code there is no were written about the simulation PWHT, but in the ARAMCO specification I'm  encountering  with  this simulation PWHT,  Two PWHT cycle to account for future repair.Please clarify my doubt about the simulation PWHT.

Virus-free. www.avast.com

Vishwas Keskar

未读,
2021年1月21日 04:54:422021/1/21
收件人 material...@googlegroups.com
Construction Codes ( ASME SEC VIII DIV I , ASME SEC I )are silent about simulation PWHT.
Client specifications( like Aramco, PDO , Shell DEPs) are specifying these simulation PWHT requirements.
We have to anticipate possible   repairs after PWHT .
Accordingly PQR shall be established .


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAFycdMz3UY6_LM9Ot8f%3Dj2NBSKU%2B1XnNgmVeWLAhcZDupZVhhw%40mail.gmail.com.

makrand sakpal

未读,
2021年1月21日 22:13:342021/1/21
收件人 material...@googlegroups.com
UCS 85

--

Kannayeram Gnanapandithan

未读,
2021年1月21日 22:13:342021/1/21
收件人 materials-welding

Pankaj Kolhe

未读,
2021年3月28日 08:33:392021/3/28
收件人 materials-welding
Yes this is client requirement,
1+ 2 simulation cycle required.
has client asked for plate , pipe, flanges and fittings?

--

mithlesh kumar

未读,
2023年2月12日 22:17:472023/2/12
收件人 Materials & Welding

In my case client is asking for P9 pipe simulation.