Dear experts

We have an ITP for structural welding in that WPS & PQR prepared as per ASME SEC IX.
  1. NDE acceptance is mentioned as ASME B 31.3 which is related process piping.
my question is 
  1. Can we use AWS D 1.1 as acceptance criteria?.
  2. Can we two different types of codes in same ITP.such like that ?

regards
Narender reddy.M

Pieper QSI

unread,
Mar 10, 2016, 2:43:30 AM3/10/16
to material...@googlegroups.com

Dear Sir,

 

Indeed ASME B 31.3 is related to process piping but ASME section IX is related to Boiler en Pressure Vessels, so in this case for structural welding I would say full project (also PQR’s / WPS) should be executed according to AWS D1.1.

 

If you can/may use different codes mixed up is depending on your customer requirements, if he allows it than it would be acceptable. I personally prefer to keep things clear and follow only one specification in order to prevent any discussions.

 

For NDT AWS D1.1 has his own acceptance criteria but for NDT techniques AWS is referring to ASME V, so there you already have a mix-up allowed by applicable specification.

 

Met vriendelijke groeten / Best Regards,

 

Herman Pieper

QA-QC Inspector / CSWIP + IWI-C Welding Inspector / IWT / Materials Expert

 

Logo nieuw klein

Job van der Havestraat 6

8384 DB, Wilhelminaoord

Cell: +31 6 51691215

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To post to this group, send email to material...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/c5adff87-f633-476c-98d5-4015c40fec19%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

image001.jpg

Narender reddy

unread,
Mar 10, 2016, 4:47:43 AM3/10/16
to Materials & Welding
Dear sir,

This is all about piping support welding ,
For this case my ITP has prepared on  WPS is SEC IX and structural welding acceptance criteria is B 31.1 is this can be possible ?
  • WPS > SEC IX & NDE B31.3 possible combination ?
  • WPS > SEC IX & NDE AWS D 1.1 possible combination ?

Babur Khan

unread,
Mar 10, 2016, 4:48:05 AM3/10/16
to material...@googlegroups.com
Dear Sir,

Please mention these points:
1. Construction Code? (AWS D1.1 or B31.3 etc.)
2. Client Specification.
3. Generally each code and discipline (Piping, Structure, Equipment, Tanks , Civil Work) required  separate ITP.

Regards,

Muhammad Babur Khan Lashari
Sr. QA/QC Inspector

(CSWIP 3.1 / CWI II From PWI) 

 Khaled Juffli Industial Company

Mob: + 966 56 2179280 / 58 2774568

PAK : + 92 334 6186285

Skype: babur.lashari

E-Mail: babur...@kjgroup.com


--

Alan Denney

unread,
Mar 10, 2016, 5:15:48 AM3/10/16
to material...@googlegroups.com

--

http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To post to this group, send email to material...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/c5adff87-f633-476c-98d5-4015c40fec19%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


This email has been scanned by BullGuard antivirus protection.
For more info visit www.bullguard.com

Lalu Rajendran

unread,
Mar 10, 2016, 6:08:39 AM3/10/16
to material...@googlegroups.com
Hi,

If it is for standards pipe supports, then you can include it the same ITP. Acceptance criteria shall be as per ASME B31.3. But if it is a separate steel structural like pipe rack which is not as a direct part of piping, then you need to have a separate ITP & WPS/PQR as per AWS D1.1.

You cannot refer AWS D1.1 acceptance criteria for a joint welded by SEC IX WPS.

regards,
LALU

--

rudolf_jude

unread,
Mar 10, 2016, 11:48:16 PM3/10/16
to material...@googlegroups.com
Hi Sir,
The WPS and NDE are 2 different matters. In the absence of a qualified WPS to AWS standards your client engineer has the prerogative to accept or reject.
Having said that the NDT acceptance ctiteria is dufferent in each standard. Even in AWS the acceptance criteria for different kind of loading is different, and the client can say what standards to follow or accept the ITP Proposed by you.
The code is a guide and the customers specification stands above the standards.



Sent from my Samsung device


-------- Original message --------
From: Narender reddy <malgire...@gmail.com>
Date: 10/03/2016 16:09 (GMT+08:00)
To: Materials & Welding <material...@googlegroups.com>
Subject: [MW:24467] Re: 24459] structural welding NDE Accaptence

Hi Dear sir,

This is all about piping support welding ,
For this case my ITP has prepared on  WPS is SEC IX and structural welding acceptance criteria is B 31.1 is this can be possible ?
  • WPS > SEC IX & NDE B31.3 possible combination ?
  • WPS > SEC IX & NDE AWS D 1.1 possible combination ?

On Thursday, 10 March 2016 10:43:30 UTC+3, hpi001 wrote:

Dear Sir,

 

Indeed ASME B 31.3 is related to process piping but ASME section IX is related to Boiler en Pressure Vessels, so in this case for structural welding I would say full project (also PQR’s / WPS) should be executed according to AWS D1.1.

 

If you can/may use different codes mixed up is depending on your customer requirements, if he allows it than it would be acceptable. I personally prefer to keep things clear and follow only one specification in order to prevent any discussions.

 

For NDT AWS D1.1 has his own acceptance criteria but for NDT techniques AWS is referring to ASME V, so there you already have a mix-up allowed by applicable specification.

 

Met vriendelijke groeten / Best Regards,

 

Herman Pieper

QA-QC Inspector / CSWIP + IWI-C Welding Inspector / IWT / Materials Expert

 

Logo nieuw klein

Job van der Havestraat 6

8384 DB, Wilhelminaoord

Cell: +31 6 51691215

 


Verzonden: donderdag 10 maart 2016 07:55
Aan: Materials & Welding

Reply all
Reply to author
Forward
0 new messages