--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/5bd85622-f5bd-43cd-bb64-4e1abaec68dfn%40googlegroups.com.
API does not have any piping design & construction code. API-570 is on post construction , maintenance and inspection. Hence ASME B-31.3 is followed commonly for fabrication, inspection and testing.
According to B 31.3 – Clause 345.3 Preparation for Leak Test
345.3.1 Joints Exposed:- (d) All joints may be primed and painted prior to leak testing unless a sensitive leak test (para. 345.8) is required.
345.8 Sensitive Leak Test: The test shall be the Bubble Test.
Thanks.
P.Goswami.P.Eng, IWE.
Independent & Consulting Welding & Metallurgical Specialist
Aramco Approved Designated Project Welding Engineer(DPWR)
Linkedin: https://www.linkedin.com/in/pradip-goswami-2999855/
Email:pgos...@rogers.com,pradip....@gmail.com
Cell/Whasapp:1-905-9793232
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CABnNWHXwWUOS4NqVkYTYYzoFmmE6uVVmwO%3Ds050YGXsTGmv3Uw%40mail.gmail.com.