I will also just speak for myself and say that before we set things in motion to tear down a sizable school building, I would like to have some idea what it would cost to make it operational as a school again.
The 46,000 square foot building at 146 Maple Street, the Central Administration Building for the School Department, has been identified in the 20 year capital plan and was given the grade of an “F” condition building. It currently needs significant investment (more than $16 million dollars) in a full replacement of the HVAC, roof, windows, envelope, and electrical. In addition, there was a space needs study performed where the CO would easily fit in space 50% smaller than what they currently have, thereby making the layout of the existing CO extremely inefficient. The net positive to demolishing this building would be the addition of new playing fields for the community.
***
The CEC report pegs that renovation cost at $20 million.
Meg Muckenhoupt
Precinct 1
Tom DiazPrecinct 8--
--
You received this message because you are subscribed to the Google Groups "LexTMMA" group.
To unsubscribe from this group and stop receiving emails from it, send an email to lextmma+u...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/lextmma/CAMFDu-HqQpTNmvjf0YmrBLv9_RARpQnA7bj1oDweqKTGwNdybQ%40mail.gmail.com.
On Nov 11, 2024, at 2:47 PM, Tom Diaz <thoma...@gmail.com> wrote:
To view this discussion visit https://groups.google.com/d/msgid/lextmma/CAMFDu-F4sdtDpmRzj%2Bqt2qTaSnwUMhiwVRrPQT8xs18K4LtuWA%40mail.gmail.com.
--
You received this message because you are subscribed to the Google Groups "LexTMMA" group.
To unsubscribe from this group and stop receiving emails from it, send an email to lextmma+u...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/lextmma/CAPJKAWLVUMF6Aa5bWFEFTn3WAcuokg4H%3DwDHn3%2BZvHDQh5CSdQ%40mail.gmail.com.