Run multiple downstream jobs in parallel

130 views
Skip to first unread message

Maneesh M P

unread,
Feb 12, 2015, 1:11:09 AM2/12/15
to jenkins...@googlegroups.com
Hello,

  I have a build pipeline where  a job has two down stream jobs connected. Currently downstream jobs get triggered through parameterized plugin. The problem I am facing is, parameterized trigger plugin kick starts the downstream jobs sequentially not parallely. 
  Is there a way to kick start down stream jobs parallaly ?

PS: I have many build servers and executers available 


Thanks,
M

Jordan Spiker

unread,
Feb 12, 2015, 10:44:08 AM2/12/15
to jenkins...@googlegroups.com
Try the multijob plugin.
Reply all
Reply to author
Forward
0 new messages