Material Line Chart dataset question

24 views
Skip to first unread message

Allen Moore

unread,
Feb 8, 2016, 9:23:48 AM2/8/16
to Google Visualization API
I need to display a pretty basic Material Line Chart EXCEPT not all of my data begins on the same date...

That is given a 14 day range along the x axis one or more plots would need to begin mid-way through the range?

Is this possible with this (or perhaps a different) tool in the library?

TIA,

-Allen M.

Sergey Grabkovsky

unread,
Feb 8, 2016, 9:53:09 AM2/8/16
to Google Visualization API
Hi Allen,

This should be possible with the regular Material Line Chart (or even with the Classic Line Chart). You will just need to leave nulls where the series doesn't have data.

--
You received this message because you are subscribed to the Google Groups "Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email to google-visualizati...@googlegroups.com.
To post to this group, send email to google-visua...@googlegroups.com.
Visit this group at https://groups.google.com/group/google-visualization-api.
To view this discussion on the web visit https://groups.google.com/d/msgid/google-visualization-api/2bd9fe64-4a12-4d9c-a687-58320cf5038a%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
--

unnamed.gif

Sergey Grabkovsky

Software Engineer

Google, Inc

gra...@google.com


Allen Moore

unread,
Feb 8, 2016, 10:05:31 AM2/8/16
to Google Visualization API
Of course...  Thank you!
Reply all
Reply to author
Forward
0 new messages