Dear ladies and gentlemen!
I have the honor to offer you the proposals of my partners for consideration:
2203. We sell manats: a). There are more than 10 billion in Iran. On pallets. Cash. With documents. The seller can deliver to the destination. Price:$70,000 per 1 million manat. b). In Turkey - 1 billion. 700 million. Cash. 3 containers, banknotes in denominations of 100, 50, 20, respectively, in each container. Without documents. The owner does not want to sell in parts, but wants the whole volume at once. Price: $75,000 for 1 million manats. Payment is possible in USDT. Pickup.
2206. I need SBLC for 500 Million Euro from Barclays Bank, we are ready to make fee payment of 50,000 Euro, after receiving MT799 Pre-advice, our bank will respond and issue MT799 BPU also pay the processing fee of 50,000 Euro, we need real SBLC direct from Barclays Bank, If you can provide this, please respond asap.
2044. I am looking for an investor to implement a unique IT project in the field of road transportation based on personal experience for 25 years in Russia.
There is a detailed business plan. Based on the fact that the trucking market is estimated at 1 trillion rubles, there is an idea to capture about 30% of the market.
We have our own IT development for accounting and control of order fulfillment and traffic throughout Russia. We have our own customer base for many years. In the future, it is planned to create an investment factoring company. The payback period of the project is 4 years. Required amount: 10 million\100 million\1 billion rubles. There are 3 stages in total.
2189. We are looking for a strategic investor to implement the project: “Auto-ferry specialized transshipment complex for handling RO-RO vessels”.
- Capacity (throughput) - 4.3 million tons;
- Number of berths - 6:
- Length of berthing front - 1,480 m.;
- Load capacity of design vessels - up to 50,000 tons;
- Total area of the formed territory (backfill in the sea) - 41.0 hectares.;
- Total area of the water area - 62 hectares.;
- Construction cost - 22 billion rubles;
- Construction duration - 3.5 years.
The transshipment complex will be built as a - specialized auto-ferry
transshipment complex for handling RO-RO vessels and will be the only one in the Azov - Black Sea basin of Russia. All documents and permits are ready. A whole range of preparatory construction and installation works has been completed.
2207. The company invites a strategic investor to implement a project for the construction of a fashionable cottage village in the Kaliningrad region of Russia, in an ecologically clean area, the site is surrounded by a mixed forest, and the distance to the sea is 19 km.
The average sales price per 1 sq. m. of housing without interior finishing work will be: from 100,000.00 rubles per sq. m. on the day of sale, with full finishing the cost of 1 sq. m. of housing will be: from 150,000 rubles per sq. m. on the day of sale.
Thus, the revenue from the sale of all houses and apartments will be:
168,397.60 sq. m. x 100,000.00 = 16,839,760,000.00 rubles and
72,170.40 sq. m. x 150,000.00 = 10,825,560,000.00 rubles with full finishing.
In total, the total revenue after the sale of the constructed housing will be 27,665,320,000.00 rubles, minus direct costs in the amount of 9,622,720,000.00 rubles - the margin before all taxes will be: 18,042,600,000.00 rubles, thus we can say that this project is highly marginal and break-even.
It is planned to carry out the construction, commissioning and sale of housing in stages, in three stages of 80,189.00 sq. m. each, the funds received from the sale of the first stages of the project are planned to be directed to further construction.
According to preliminary calculations, the construction of all infrastructure facilities for the life support of the village as a territory of integrated development will require the following amount: 15,275,000,000.00 rubles.
Thus, for the implementation of the first stage of construction of the village with all communications, together with the initial investments for the purchase of a site with permits (213,600,000.00 rubles), the amount required will be: 3,421,160,000.00 rubles of capital investments.
In order for the construction of this village to proceed smoothly and have the status of a territory of integrated development, in parallel with the construction of housing, it is necessary to carry out the construction of infrastructure facilities responsible for the life support of the entire complex, the cost of such a Project, according to preliminary calculations, is: 35,000,000,000.00 rubles. (Thirty-five billion) rubles.
It is also necessary to take into account that in the Kaliningrad region, according to the Federal Law "On the Special Economic Zone", when investing in the development of production (purchase and construction of fixed assets) in the amount of more than 150 million rubles, the investor is exempt from income tax (20%) and property tax (2.5% of the value of assets per year) for a period of 6 years. In the following 6 years, 50% of these taxes are paid.
A detailed business plan has been developed, all necessary documents, permits, results of laboratory and geological studies have been received.
2208. The company invites a strategic investor to implement a project for the construction of a cement plant with a capacity of 4.2 million tons of cement per year in the Kaliningrad region of Russia.
According to preliminary estimates, the cost of implementing this project with all the infrastructure is 32,020.6 million rubles. This amount includes all costs for survey work and the acquisition of sites with minerals necessary for cement production, design, purchase of the necessary equipment for cement production, construction of a geothermal power plant to supply the entire production with electrical and thermal energy, construction of a residential village for employees of the complex, construction and installation work, commissioning and personnel training.
The project involves the organization of production of cement in demand on the domestic market of the Kaliningrad region and beyond.
Promising types of cement for production: Portland cement grades: M-500 D0; M-500 D20; M-400 D0; M-400 D-20, and many other grades of cement, including special ones.
Total construction period to production launch: 18-20 months, including design – 3 months,
equipment delivery – 8-10 months
construction of foundations for equipment and additional premises – 6 months.
Calculations for the project are made on the following terms:
Product: Cement PC M-500 D0, bulk.
Selling price of the manufacturer (PC M-500 D0), ton: 4800.00 rubles (with VAT).
Annual sales volume: 4.2 million tons.
Total profit (excluding VAT and expenses) 20.160 million rubles.
Expenses: raw materials, materials, energy 3.522 million rubles.
Tax expenses 35.6% - 7.180 million rubles.
Total: the company's net profit is 9.458 million rubles.
A detailed business plan has been developed, all necessary documents, permits, laboratory and geological research results have been obtained.
2209. The company invites a strategic investor interested in investing financial resources from 30 trillion rubles to implement this project: The Shtokman field was discovered in 1988. Almost 4 trillion cubic meters of gas or 169 trillion rubles were put on the state balance sheet as of the current date. The production area is located far beyond the Arctic Circle of the Russian Federation in the Barents Sea. The company "Shtokman Development AG" (currently declared bankrupt) was formed by the Russian government on February 15, 2008 for the design, financing, construction, operation of gas production at the Shtokman gas condensate field. Research, engineering and survey work, design work have been carried out and are at the disposal of the operator company. It is necessary to continue the project: manufacture, deliver, assemble offshore platforms, produce, process gas, deliver and sell to Gazprom customers. The company is ready to continue and implement the project for the extraction, processing and sale of gas. Reaching the design capacity of gas production, 100-150 billion m3 or 70-108 million tons of LNG, is planned in 5 years, from the start of project financing.
Revenue will be 16-25 trillion rubles per year, and net profit at least 5-8 trillion rubles per year.
Currently, a detailed business plan has been developed, all necessary documents, permits, results of laboratory and geological studies have been received.
2210. The company invites a strategic investor to implement a project for processing ore dumps in the Republic of Khakassia, with the subsequent production of iron concentrate, gold, silicon and other chemical elements for their further use or sale.
During the operation of the existing iron ore mine (from 1875 to the present), about 35 million tons of tailings have accumulated after primary ore processing.
First of all, it is necessary to build under this Project:
1. Enrichment plants for ore processing and iron concentrate mining;
2. A steel smelting plant with arc steel-making furnaces and rolling mills - these are arc steel-making furnaces based on the Midrex direct reduction iron process. It is also planned to purchase rolling mills to obtain a wide range of finished products.
3. A silicon production plant;
4. A refinery for obtaining gold by cyanidation; for processing gold concentrates, it is also planned to purchase refining equipment and place it in close proximity to the mining sites.
5. Other production facilities for the extraction of all industrially and economically significant chemical elements of the periodic table;
6. A plant for the production of building materials from ore residues.
In this way, the Waste-Free Production Project will be implemented, which will bring not only economic benefits, but also environmental benefits to the entire region as a whole.
According to preliminary estimates, the implementation of this Project will require investments in the total amount of: USD 3,500,000,000.00 (Three billion five hundred million) USD, for the first stage of developing this Project, USD 500.00 million (Five hundred million) USD is needed. The main amount will be required after the preparatory period in equal tranches of USD 500.00 (Five hundred million) USD over two years in accordance with the developed Project implementation schedules. The investment amount will be: RUB 350,000,000,000.00 (Three hundred and fifty billion) RUB. After the launch of all production, this investment amount will pay off many times over the course of five years of operation of the industrial complex.
A detailed business plan has been developed, all necessary documents, permits, results of laboratory and geological studies have been obtained.
2213. Our gold mining company has been operating in the Democratic Republic of the Congo (Kinshasa) since 2016. Our specialists have been working in the country since 2007 and have a good administrative resource in the Government of the republic, as well as in the governments of the ore provinces. We are working under a mandate from the Tshopo Provincial government, as well as cooperating with ANR RDC and CEEC. We supply Dore ingots (92-98% purity) from several sources in the DRC. The price is -10-15% of the LME. To expand the business (purchase of equipment, lease of additional land, etc.), we are looking for an investor with free funds in the amount of USD 23 million. We are ready to provide a detailed business plan. Previously, we worked in Mali, the turnover per month was 14 million USD, and in the Ivory Coast. Ivorian - 8 million USD.
2211. I sell rare earth metal CALIFORNIA, grade “A", there are 500 grams.
2212. We are engaged in gold, we work in Africa (Uganda), supplies to Dubai for refining, we sell at a discount of 5% from the London Stock Exchange, we do it to investors minus 10%. 2215. Urgently selling 1 BTC = 50,000 USD.
2216. The seller wants to exchange the wallet of the first seller for 5,000 BTC and your wallet for 100 million. USD to confirm, and then proceed to the next step.
2217. It is possible to ship aluminum to China, etc., directly from Rusal and with a direct contract. Without prepayment. From 50,000 tons. Everything is based on the fact of shipments according to the depth of the discount. The details are closer to the point. I need a request from the client for Mr. Nikitin on the buyer's letterhead.
2218. A retail chain in Moscow (Russia) will buy energy drinks: “Adrenaline” and “Gorilla”, volume: 0.5 liters, classic, maybe not original, good quality.
2219. a). I sell 400 boxes of Blue Zim in Zurich and Miami.
b). We buy boxes of German bonds from 1934 for 3 billion. USD per box.
2220. USDT for sale 4% discount large quantity. Procedure upon request.
2221. I have for sale golden bible mother box and 1 single frb black box.
2222. I have Zim Gold seller on Philippines.
2223. My Private Buyer group buy 5 boxes German Bonds and 5 boxes Yellow Dragons.
2224. We have a buyer seeking a TOV package. He is offering 1T.
1% paid at closing and total payment 60 days thereafter. Closing must be in Zurich.

Igor
Hi Igor
(#2219). Blue Zims 400 boxes. I have buyers for Blue Zims in Miami. What is the price. Do you have a updated recent KYC, with SKR and POL. If possible we would like to move forward asap
--
You received this message because you are subscribed to the Google Groups "BANK INSTRUMENT PROVIDER ( SBLC/BG, BANK DRAFT, 103/202 DEALS )" group.
To unsubscribe from this group and stop receiving emails from it, send an email to bank-instrument-provider--sblcbg-b...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/bank-instrument-provider--sblcbg-bank-draft-103202-deals-/da110028-de3d-4b06-b636-4ef8f405126an%40googlegroups.com.
--
You received this message because you are subscribed to the Google Groups "BANK INSTRUMENT PROVIDER ( SBLC/BG, BANK DRAFT, 103/202 DEALS )" group.
To unsubscribe from this group and stop receiving emails from it, send an email to bank-instrument-provider--sblcbg-b...@googlegroups.com.