I’d rather they just build the tunnel, get a full divided road out of the way and get it done. Now is the perfect chance with the road irreparable and closed. Of course that won’t get done.
I see Chifley/Darling being the main route to Sydney for some time given the extent of the damages. This idea is good but they really need to just bite the bullet and replace the bridge with a new four lane bridge, making the entire ascent four lanes (2 each way) from the Little Hartley section to Mt Vic.
In the interim, something should be done about the B59 through Lithgow. This route should definitely be rerouted to a bypass route to get BLOR traffic out of the town centre.