Hello,
On Jan 30 at 15:52 -0800,
clwa...@gmail.com wrote:
> I have just recently started using Mnemogogo, but I have noticed
> that my scheduled cards are out of sync between Mnemosyne and
> Mnemogogo.
>
> For example: When I export to Mnemogogo it shows that I have 16
> cards scheduled for tomorrow, however when I import back to
> Mnemosyne it shows that I have 16 cards scheduled for the day AFTER
> tomorrow and nothing for tomorrow.
Could you please open the CONFIG file exported by Mnemogogo (using
Notepad or similar) and check the line that begins with "start_date="
and "start_days="?
Normally, these values should be "1970-01-01" and "0", respectively,
but they may be "1969-12-31" and "-1", in which case the schedule in
Mnemododo will be one day off.
> I looked in the forum for similar problems and came across a post
> with a similar issue. In that instance, it turned out to be a
> timezone problem between the two devices. I have checked and double
> check, and I am sure that time zones and local time are the same for
> my phone and my computer.
The discrepancy with start_date and start_days caused this problem for
somebody else. I still haven't figured out why the exported values are
incorrect (and why the problem was only reported so recently), but I
will do so soon.
@Peter, did the start date adjustments during upgrade from Mnemosyne
1.x change within the last four or so months?
Tim.