I was thinking, that instead of having just a raw percentage change
for the progress bar. Maybe it could be done either combined with a
comment or just a quick note. So you can then list out the history of
a task and see that it was
25% done at xx/xx/xxxx xx:xx:xx by btong "installed webserver".
40% done at xx/xx/xxxx xx:xx:xx by btong "imported source code".
75% done at xx/xx/xxxx xx:xx:xx by btong "configured stuff".
It would also be cool to maybe combine this with maybe a todo list
that is part of a task. I know that I have always been torn to
granularize tasks vs having one that takes longer. I think having
TODO's would make it a bit more granular. And then with the todo items
we could eventually do some kind of gantt chart generation based on
the project data.
Thanks
> --
> You received this message because you are subscribed to the Google Groups
> "flyspray" group.
> To view this discussion on the web visit
>
https://groups.google.com/d/msg/flyspray/-/xbIl6ZfQfMkJ.
> To post to this group, send email to
flys...@googlegroups.com.
> To unsubscribe from this group, send email to
>
flyspray+u...@googlegroups.com.
> For more options, visit this group at
>
http://groups.google.com/group/flyspray?hl=en.
--
--------------------
Bryan Tong
Nullivex LLC | eSited LLC
(507) 298-1624