DDA Water Bill Online payment accepted-

704 views
Skip to first unread message

REJIMON C K

unread,
Oct 30, 2014, 6:50:59 AM10/30/14
to DWARKA FORUM
Good News ONLINE Payment for Water Bill started

http://dda.org.in/WaterBillOnline/default.aspx



On Fri, Aug 8, 2014 at 11:45 AM, Mahesh Gupta <mahes...@gmail.com> wrote:
1. Month has passed and Online system is not operational.

2. The officials ate DDA Payment counter at Manglapuri are charging Rs. 20/- per bill if the bills are deposited in Bulk. I will suggest, that till the time ONLINE system is made operational, atleast one person should be deployed for collecting the bills in Bulk and thereafter receipt can be issued (Cheque payment only).

Thanx


On Tue, Jul 15, 2014 at 3:32 PM, Dwarka Forum(Regd) <dwark...@gmail.com> wrote:
 

 

July 14, 2014

Minutes of Meeting

 

Meeting with Chief Engineer, Dwarka - Mr. DP Singh

Date:  July 12, 2014

Venue: Chief Engineer’s Office DDA Office Manglapuri

 

 

Mr. Sushil Kumar introduced  Dwarka Forum (‘DF’) team members to The Chief Engineer. Mr DP Singh and briefed the background and DF’s initiatives.

CE Chaired the meeting and discussed all the agenda points.

 

1.    Online payment of water bills facility will be operational within this month; discount on clearing arrears.

 

2.    Bharat Vandana Park – Two distinct designs are ready, will get uploaded on DDA website to invite public comments for finalization

 

3.    Water Supply

a. Fetching 200 tankers daily from 12 new borewells 
b. DDA pushing for handover of water supply to DJB 
c. DDA also ready to pay cost around Rs.200 Cr to DJB
d. Study/estimate done for getting additional water for horticulture thru DJB WTP 
e. CE will share copies of letter exchanged with DJB

 

4.     Roads:

 

a.        Roads 30 meters & above to be transferred to PWD after Mansoon

b.        Concrete road for service roads not possible presently due to digging requirement for service facilities by many agencies

c.        DF to resend MoM of Road Survey points carried out with DF and DDA jointly for action by DDA

 

5.     Entry/Exit Routes – 

a.     Tunnel approach road to T3 could be executed if pushed with Urban Dev and Civil Aviation ministries. 

 

b.     Possibility of small underpass at Shahbad for small vehicles to ease load on Sec-21 underpass.

c.   For better utilization of Dwarka Flyover, Traffic police to be contacted, DDA willing to extend support, if receive request from Traffic Police. DF has already suggested and sent letter to this effect to Traffic Police. DF will follow up with Traffic Police.

 

d.   UER road to Nangloi in doldrums due to encroachment and difficulties in acquiring land after recent land acquiring law

 

6.     Unalloted shops/flats/plots: Reserve price concept and manual auction scrapped, E-auction to adopted for all future auctions 
 

7.     Socio Centre at Sector 11 – To be started soon with facilities like IIC

 

8.     Vegetable Marks, Community centers – CE to check status with Planning wing and push

 

9.      Electrical Work – CE-Electrical to be contacted. DF will be contacting them shortly.

 

10.    Sports facilities – CE at Shahpur Jat, Siri fort to be contacted. DF will be contacting them shortly.

 

11.    Basements parkings - Unutilized at Malls/ Hospitals – DDA Director (Buildings) enforcement to be contacted. DF to send a list of Malls which are unutilized or misused or locked up to CE.

 

12.    Coverage of Drain at Madhu Vihar – Plan costing around Rs 12 Cr ready, could be executed if no objection from NGT

 

13.    Also took up the issue of his email id.  He said the size of this mail box is less and he is requesting his Assistant to clear up mails regularly.

14.    Condition for DDA flats in Dwarka was discussed in detail.CE informed that DDA is planning for a scheme where 50% will be borne by DDA and 50 % by respective RWA and the same will be put up for approval from appropriate authority.However,on case to case basis DDA is doing repair work where the condition is very bad.It was also informed by him that tender for sector 13 and 14 has been approved for repair of DDA flats.


other points shared:


Out of several issues discussed, we would like to pen down a few
relatively short term issues within your control for early resolution:

(i)                 Overhead Sign Boards: There is shortage of
overhead sign boards in Dwarka, which is causing inconvenience to many
of the motorists. At least all the entry & exit points to Dwarka & MP
road crossings must have it. You may also find that foundations were
laid on several crossing for erecting structures for fixing such sign
boards but is being abandoned by DDA mid way. Request you to take it
up.

(ii)               Road Numbering: There is long standing problem of
identification of roads & crossings in Dwarka. Even after one decade
of habitation we still find it difficult to identify locations.
Request you to arrange for allotting numbers to all roads & crossings
in Dwarka. The roads which have already been allotted numbers be
provided with more signages.

(iii)             Left Turm Slip road: In Dwarka at several crossings
we find that there are no slip roads for left turn. Now at a time when
Delhi has been cited as most polluted city we can not afford extra
waiting time for any vehicle. Though this a patent planning error we
request you to initiate study to provide all MP roads with left turn
slip roads. On crossings & T points where ever carving a slip road is
not immediately feasible at east the curve can be smoothened to reduce
the impact of sharp edge.

(iv)             Footpath Utility: Thre is absolutely no attention is
paid by field staff towards maintenance of footpaths as a result there
are several problems like erection of obstructive sign boards by
several other agencies, raising of walls, blocked entry & exit points.
Requst you to instruct staff to remove all the sign boards & walls
from the footpaths. In addition, at some places due to uprooting of
kerb stones vehicles find there way on footpath so please get poles
installed on all entry & exit points.

(v)               Non-tapering: The MP roads have been recently
carpeted, on some T point & crassings where mastic carpeting has not
been done, the old & new levels have not been tapered resultimg in
sudden strike to vehicles. This calls for inquiry how such things got
un-noticed.

(vi)             Painting: It is understood that the new painting on
MP roads should have been reflective in nature but we don’t find it
so. Needs verification.

(vii)           Road Inspection: It is unfortunate that there is no
system of regular road inspection in Dwarka. We think that regular
road inspection is back bone of engineeting department and if
effectively done it can avoid many problems. Request issue instruction
to staff to regularly inspect the roads with defined frequency &
specific points, some of which could be:

a)            Whether any kerb stone is uprooted on central verge or footpath,

b)            Whether any pothole is visible - if yes where and about what size?

c)             Is any patch on road is about to convert into pothole?

d)            Is any portion of footpath/road is caved in?

e)            Is there any open man- hole?


f)             Is there any falling pole, railing, wire, overhead sign
board or tree,

g)            Is there any obstruction on footpath likely to create
problem for pedestrians?

h)            Is there any dug up space on footpath or road
inadequately barricaded or lying unattended for many days?

i)              Is there any unpainted zebra crossing or speed-breaker?

j)             Is there any encroachment on road or footpath?

k)            Is entry & exit points of footpath have appropriate
poles fixed so as to prevent climbing of vehicles on it?

l)              Is there any water logging, construction material,
debris or any other kind of material lying on road?

m)                Is there any damage to any kind of street furniture?





(viii)         Plaster Quality: The quality of plastering being done
on several walls contructed around vacant plots, parks is undoubtedly
of vey poor grade. It appears that plastering is done with sand only
and no cement is used. After plastering no wetting is done as a result
the plaster sheds off very early. Request you to take appropriate
steps to check this mal-practice.

(ix)             Pot Hole Repair: Thers is no practice in Dwarla to
regularly repair the potholes. Wait is done deliberately for potholes
to grow old & big. Request you to arrange for repair of All potholes
before onslaught of monsoon.

(x)               Email Box: Request instruct your PS to regularly
remove the maiols from in box to keep space for new mails.

 

CE assured that he will look into all the points and keep us posted.  Meeting ended with vote of thanks.

Copy to: Mr. DP Singh, CE- Dwarka

                 Mr.  Balvinder Kumar 

  




--
Membership Application- Please visit...
http://www.dwarkaforum.org/self-support/
 
We are on Facebook: http://www.facebook.com/Dwarkaforum
DWARKA FORUM (Regd) www.dwarkaforum.org
---
You received this message because you are subscribed to the Google Groups "DWARKA FORUM (Regd)" group.
To unsubscribe from this group and stop receiving emails from it, send an email to dwarka-residen...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

--
Membership Application- Please visit...
http://www.dwarkaforum.org/self-support/
 
We are on Facebook: http://www.facebook.com/Dwarkaforum
DWARKA FORUM (Regd) www.dwarkaforum.org
---
You received this message because you are subscribed to the Google Groups "DWARKA FORUM (Regd)" group.
To unsubscribe from this group and stop receiving emails from it, send an email to dwarka-residen...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.



--
REJIMON C K.
Sent over wireless Network ... Google Nexus Phone.

Kaushal Khanna

unread,
Oct 30, 2014, 11:51:11 AM10/30/14
to dwarka-residents
Hi ! 

Received water bill from DDA and rate hiked to INR 363/- per month. Did any DDA society received any notification or communication from DDA regarding hike in water charges? 

Also water supplied to our society is from borewells with high TDS ranging between 1600 to 2500 which is causing skin/health problems and severe damage to appliances, fittings etc.
Need DF member's suggestion for taking up this matter with DDA.

Thanks,
Kaushal

LAXMAN

unread,
Oct 30, 2014, 10:42:22 PM10/30/14
to dwarka-r...@googlegroups.com
Dear sir,

When I tried to register myself for making online payment of DDA Water Bill, the system is asking
Consumer ID. There is no any Consumer ID on my previous all bills.

Can anyone suggest me that from where I will get this Consumer ID.

Regards,

LAXMAN KUMAR
SEC-11, DDA FLATS, ND
(M)9811242295

On Thu, 30 Oct 2014 16:21:01 +0530 REJIMON C K wrote

>Good News ONLINE Payment for Water Bill started

http://dda.org.in/WaterBillOnline/default.aspx



On Fri, Aug 8, 2014 at 11:45 AM, Mahesh Gupta wrote:
1. Month has passed and Online system is not operational.
2. The officials ate DDA Payment counter at Manglapuri are charging Rs. 20/- per bill if the bills are
deposited in Bulk. I will suggest, that till the time ONLINE system is made operational, atleast one
person should be deployed for collecting the bills in Bulk and thereafter receipt can be issued (Cheque
payment only).

Thanx

residents+...@googlegroups.com.


For more options, visit https://groups.google.com/d/optout.






--

Membership Application- Please visit...

http://www.dwarkaforum.org/self-support/



We are on Facebook: http://www.facebook.com/Dwarkaforum

DWARKA FORUM (Regd) www.dwarkaforum.org

---

You received this message because you are subscribed to the Google Groups "DWARKA FORUM (Regd)" group.

To unsubscribe from this group and stop receiving emails from it, send an email to dwarka-
residents+...@googlegroups.com.


For more options, visit https://groups.google.com/d/optout.



--
REJIMON C K.

Sent over wireless Network ... Google Nexus Phone.



http://www.facebook.com/#!/pages/RejimonCK/180529618720807






--
>
Membership Application- Please visit...
>
http://www.dwarkaforum.org/self-support/
>

>
We are on Facebook: http://www.facebook.com/Dwarkaforum
>
DWARKA FORUM (Regd) www.dwarkaforum.org
>
---
>
You received this message because you are subscribed to the Google Groups "DWARKA FORUM (Regd)" group.
>
To unsubscribe from this group and stop receiving emails from it, send an email to dwarka-
residents+...@googlegroups.com.

>
For more options, visit https://groups.google.com/d/optout.
>

Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >

Madhuri Varshney

unread,
Oct 30, 2014, 10:42:36 PM10/30/14
to dwarka-r...@googlegroups.com
Its true DDA hiked price per ltr from 10.26 Rs to some 14 Rs w.e.f. April 2014 without any notification. In fact in our pocket, we got our bills after one yr with raised amount. They don't have any explanation for this.

Regds
Madhuri
Sec-3

Mahendra Kumar Gupta

unread,
Oct 31, 2014, 8:13:07 AM10/31/14
to dwarka-residents
This is the dictatorship and untransparent working.  We may ask DDA to give water first and charge reasonalby in line with the tarif of DJB.  Water supply should be handed over to the DJB as soon as possible.