Dear WRF-Hydro community,
I
 am new in WRF-Hydro and am in the process of preparing a simulation in a
 watershed of one of the major rivers in Mexico (Papaloapan river). Te 
domain (red rectangle in figure attached) includes two catchments (brown
 and pink polygones) and I will be using WRF to force the model. 
Streamflow in a gauge station (red marker in figure) downstream the 
catchments presents high baseflow (~200 m³/s) (lower panel in figure 
attached), which in this example is for 2012. 
My
 question is what would be the best approach to incorporate this 
baseflow to a run if I want to simulate, let's say, the period of time 
between the vertical dashed lines (~June 2012) in the time series, in 
terms of baseflow bucket setup or/and spin up time, etc?
Many thanks in advance.
Best,
Erick Olvera