I am running a document routing process with an initiator revision stage (attached process diagram). The routing is a traditional routing process with a backward loop for the initiator revision.
The form that is routed includes multiple drop down lists that have initialization values. As the form routes through the approval process when a change is made it appears as the value at the next routing stage.
However when this form moves to the initiator for revision (through the backward loop, see process image), the value the initiator sets for the drop down list is not shown in the following process stage. It is like the initiator never changed the value. Even more curious is the fact that if you send the form back to the initiator for a second revision (second time through the backloop) it shows the value that was set in the first revision (first backloop), which did not appear in any of the in between stages.
Thank you for your assistance,
Chris
--
Fujitsu - RunMyProcess
---
You received this message because you are subscribed to the Google Groups "Fujitsu RunMyProcess Developer Community" group.
To unsubscribe from this group and stop receiving emails from it, send an email to supportforum...@runmyprocess.com.
To post to this group, send email to suppor...@runmyprocess.com.
Visit this group at http://groups.google.com/a/runmyprocess.com/group/supportforum/.
To view this discussion on the web visit https://groups.google.com/a/runmyprocess.com/d/msgid/supportforum/ed4b816e-4bab-4a6f-866c-ca91454a4b30%40runmyprocess.com.
For more options, visit https://groups.google.com/a/runmyprocess.com/d/optout.
ChrisThanks Again,Hi Pankaj,I have continued to do some digging on this problem and I found out that the issue looks like the values of the form located at ${P_task_url} is not being updated, but if you look at the form at the same stage of the process using the Process Report--> Open Form interface the form value is updated. I have attached screenshots of the form linked to P_task_url (Image 3) and the form linked to the Process Report interface (Image 2). The current process ID state when these screen shots were taken was 38 (as you will see in both the P_taks_url in image 3 and the Process Report screenshot in image 4). Why would the form linked to the P_tak_url not be updated?
ChrisBest Regards,Pankaj,I have rewritten this project into a more easily understandable process. This process is located in the project "TechMah- Backloop" on the TechMah interface. Please let me know if I have to do something to give you access to this project.