LOCATION: Academic and Student Recreation Center (ASRC), Broadway Residence Hall (BDWY), Urban Center Building (URBN)
DURATION: 2/25/2026 from 6:00:00 AM to 12:00:00 PM
PROJECT INFORMATION: Pressure washing will be conducted at Urban Center Building, ASRC, and Broadway Housing Loading Docks on Wednesday, February 25, 2026 at the following times:
Wednesday February 25, 2026
Urban Center loading dock: 6am-8am
ASRC: 8am-10am
Broadway Housing: 10am-12pm
PROJECT BENEFITS: High traffic and use of the loading docks creates grime that builds up in the area. Regularly occouring pressure washing helps keep our loading docks clean.
IMPACT: Loading docks will be wet during the duration of the work. Vehicles will not be allowed to park in the loading docks during this work.
ACCESSIBILITY IMPACTS: None
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Keith Childs |
(503) 382-8341 |
keith....@premgrp.com |
| |
|
|
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407