LOCATION: Cramer Hall (CH), Lincoln Hall (LH)
DURATION: 6/15/2026 to 6/18/2026 from 8:00:00 AM to 4:00:00 PM
PROJECT INFORMATION: A contractor will be washing the exterior windows of Cramer Hall and Lincoln Hall. This work will require a combination of ground-level access, elevated lift access, and rope descent from the roof.
PROJECT BENEFITS: This will restore clear views from inside the buildings and improve the amount of natural sunlight entering the buildings.
IMPACT: As this work progresses around the exterior of both LH and CH, there will be variations of work zone delineation and safety signage relative to the crew size and methods required to access and clean the windows.
ACCESSIBILITY IMPACTS: Some exterior doors may be temporarily closed during overhead work for pedestrian and worker safety. During these times, signage directions to alternative routes will be posted.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Joe Potter |
(971) 275-7155 |
pott...@pdx.edu |
| Gail Hamilton |
(503) 209-5119 |
g...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407
Work Control Center
Facilities and Property Management
202 University Services Building
617 SW Montgomery
Portland, OR 97201
Phone: 503-725-2FIX
Email: 2F...@pdx.edu
Click Here for the Work Control Center Online
~ Supporting Student Success ~