LOCATION: Smith Memorial Student Union (SMSU)
DURATION: 6/29/2026 from 4:00:00 AM to 10:30:00 AM
PROJECT INFORMATION: The SMSU Re-Roof Project will be replacing the existing roof system.
Upcoming construction activities:
Boom truck pick to lift roofing supplies onto the SMSU roof.
PROJECT BENEFITS: The new roofing system will provide improved weather protection, enhance the building's energy efficiency, and prevent future water intrusion, ensuring a more comfortable environment for all students and staff.
IMPACT: See attached diagram showing impacts.
The Pedestrian Pathway between SW Park and SW Broadway on the south side of SMSU will be minimized from 4:00AM - 10:00AM. Entrances to Smith Memorial Union will be open per normal operation.
As a precaution, third floor spaces, Suite 332, 333 and fourth floor spaces 423, 432A and Suite 433, located directly below the loading zone will remain closed during lift operations.
ACCESSIBILITY IMPACTS: - Entrances: All entrances remain open, specific exterior pathways or doorways may be temporarily redirected during crane lifts or material delivery.
- Alternative Routes: If a specific pathway or entrance is temporarily closed, directional signage will be posted to the nearest alternative.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Anthony Moreschi |
503-725-2837 |
more...@pdx.edu |
| Quinn Soifer |
503-725-4316 |
soi...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407
Work Control Center
Facilities and Property Management
202 University Services Building
617 SW Montgomery
Portland, OR 97201
Phone: 503-725-2FIX
Email: 2F...@pdx.edu
Click Here for the Work Control Center Online
~ Supporting Student Success ~