LOCATION: Stephen Epler Residence Hall (SEH)
DURATION: 2/13/2026 from 9:00:00 AM to 12:00:00 PM
PROJECT INFORMATION: FPM will perform code-required annual fire testing on the elevator(s).
PROJECT BENEFITS: This test ensures the proper operation of the elevator during a fire alarm.
IMPACT: The elevator will be recalled to certain floors, and elevator service will be slow. The door holders will drop and there will be a minimal beeping.
ACCESSIBILITY IMPACTS: The elevator will be recalled to certain floors, and elevator service will be slow.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Tim Carpenter |
971-275-7236 |
tcar...@pdx.edu |
| Kevin Johnson |
503-998-6897 |
kev...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407