LOCATION: Fourth Avenue Building (FAB)
DURATION: 7/22/2025 to TBD
PROJECT INFORMATION: Door repairs are underway for the northwest entrance to the Fourth Avenue Building (FAB) located on SW Harrison Street. The entrance is available for use, but the ADA button and automatic door opener are not functioning. Facilities & Property Management crews are assessing repair options.
PROJECT BENEFITS: Repairs will allow door and automatic opener to function.
IMPACT: The door must be manually opened without assistance from the automatic opener. Users requiring the use of an automatic opener should enter from the City Tower/1900 Building entrance, located on SW 4th Avenue. The elevators in the City Tower lobby may be used to access the Lower Level of FAB. PSU's Engineering Building also has an ADA button and automatic opener at the entrance. The Engineering Building's lower level connects to PSU's Fourth Avenue Building.
ACCESSIBILITY IMPACTS: Users requiring the use of an automatic opener should enter from the City Tower/1900 Building entrance, located on SW 4th Avenue. The elevators in the City Tower lobby may be used to access the Lower Level of FAB. PSU's Engineering Building also has an ADA button and an automatic opener at the entrance. The Engineering Building's lower level connects to PSU's Fourth Avenue Building.
PROJECT COORDINATORS:
NAME | PHONE | |
---|---|---|
Work Control Center |
503.725.2349 |
2f...@pdx.edu |
|
|
|
|
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407