LOCATION: Fariborz Maseeh Hall (FMH)
DURATION: 3/20/2026 from 6:30:00 AM to 10:00:00 AM
PROJECT INFORMATION: Kone Elevator will be on-site to perform the State-required annual elevator testing.
PROJECT BENEFITS: Annual State required testing will ensure proper elevator emergency life safety operation.
IMPACT: Elevator service wait times may be longer than normal due to testing.
There will be minimal beeping from the fire alarm panel.
ACCESSIBILITY IMPACTS: Elevator service wait times may be longer than normal due to testing.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| James Kavalec |
971-275-7235 |
kav...@pdx.edu |
| Tim Carpenter |
971-275-7236 |
tcar...@pdx.edu |
| Work Control Center |
503-725-2349 |
2f...@pdx.edu |
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407